Worksheet
Engineering change note template
A one-page form with five blocks. The first holds the drawing number, old revision, new revision and reason. The second lists parts added, removed or substituted. The third gives the stock decision for each part. The fourth records approvals and the cut-in serial number, and the fifth is a tick list for purchasing, stores, the floor and the spares counter.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Bill of materials control for farm equipment makers”, www.gullysystem.com/blog/bill-of-materials-control-for-farm-equipment-makers