Skip to main content
GullySystem
← Back to the guide

Worksheet

PCB assembly software fit sheet

Three blocks share a single sheet. Block one lists the must have records. Rows are BOM import, alternates, kitting, serial capture, AOI result and certificate, and columns mark each as met, partly met or missing for up to four vendors. Block two holds your five customer queries, each with a tick for answered or not answered per vendor, plus a note of what was shown. Block three lists the machines and systems to connect, such as the pick and place line and the label printer, plus a column naming who builds each link.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Choosing management software for a PCB assembly company”, www.gullysystem.com/blog/choosing-management-software-for-a-pcb-assembly-company