Worksheet
Drawing revision change checklist
A checklist headed by part number, old revision, new revision and effective date, with six rows below: control plan, PFMEA, work instruction, gauge, inspection sheet, customer notice. Five columns record the owner, the change made, the old copy removed, the first-article result and the sign-off date, so no row closes without evidence.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Control plan and drawing revision checklist for component makers”, www.gullysystem.com/blog/control-plan-and-drawing-revision-checklist-for-component-makers