Worksheet
Packaging job cost comparison sheet
This sheet has two columns, quoted and actual, down the rows. The rows cover board or film, ink and coating, plates and dies, each machine process by hours, make-ready waste, rework hours, outsourced finishing and freight. A final block records the variance and the reason code, such as late proof, slow die cut or short run.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Costing a Packaging Job: Material, Machine Time and Finishing”, www.gullysystem.com/blog/costing-a-packaging-job-material-machine-time-and-finishing