Skip to main content
GullySystem
← Back to the guide

Worksheet

Packaging job cost comparison sheet

This sheet has two columns, quoted and actual, down the rows. The rows cover board or film, ink and coating, plates and dies, each machine process by hours, make-ready waste, rework hours, outsourced finishing and freight. A final block records the variance and the reason code, such as late proof, slow die cut or short run.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Costing a Packaging Job: Material, Machine Time and Finishing”, www.gullysystem.com/blog/costing-a-packaging-job-material-machine-time-and-finishing