Skip to main content
GullySystem
← Back to the guide

Worksheet

Cutover checklist sheet

A one page sheet in three blocks. They are before, during and after. Each row carries a task, an owner, a due time, a done tick and a notes column, so nothing floats between people. A strip at the foot holds the freeze hour, the rollback decision maker, the count of held-back rows and the signature of each ledger owner.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Data migration checklist: before, during and after cutover”, www.gullysystem.com/blog/data-migration-checklist-before-during-and-after-cutover