An ERP for electrical equipment makers must handle drawing and BOM revisions, test records tied to serial numbers, bought out parts with long lead times and copper linked pricing. Generic modules cover stock and accounts. Gaps appear around traceable test paperwork.
Why generic ERP strains on electrical products
Generic ERP expects the same item to come off a fixed recipe, batch after batch, while an electrical equipment maker builds to each customer’s rating, drawing and test requirement.
Two transformers of equal kVA can differ in tapping range, vector group, cooling and bushing make, and none of that fits a catalogue line with one stock code. Each order is a project. Generic setups push those differences into free text notes, so a planner searching for the vector group of last year’s order finds nothing and rereads emailed drawings. That costs real time.
Ask each vendor to take one such order, with its own drawing, BOM and inspection plan, from enquiry to dispatch on your real product, before anyone mentions price.
Revisions that stay locked to the job
Drawings change after approval. The system should let engineering release a BOM revision, flag what changed and block purchase or issue against the old one, which keeps wiremen and storekeepers off stale prints.
Look for change notes that name jobs. A revision that silently overwrites the old BOM is worse than no system, because it erases the history you need during a dispute with the buyer.
Test it with a live example. Revise a BOM on a job that already has stock issued, then see what the screen tells the storekeeper about busbars, lugs and breakers already on the shop floor.
- Revision letter on drawing and BOM
- Change note listing affected jobs
- Block on issuing stock against a superseded BOM
- History kept for the customer’s audit
Routine test records tied to serial numbers
Rated products are tested before dispatch. A transformer gets ratio, winding resistance, insulation and loss readings, a motor gets no load and locked rotor checks, and switchgear gets dielectric and mechanical operation tests.
The ERP should hold one test template per product family and attach each filled sheet to its serial number, so dispatch sees pass or fail before loading. An untested unit cannot slip out.
Ask whether the result exports as the customer’s own inspection format, because retyping readings into that format costs the quality team hours every week.
- Test templates per product family
- Instrument and calibration reference on each sheet
- Hold on dispatch for untested serial numbers
- Rework note when a reading fails
Bought out parts and copper cost
Breakers, relays, bushings, cable and laminations arrive from outside suppliers on uneven lead times, so each job needs supplier follow up dates and goods receipt against every purchase order. Add a shortage view by job.
Metal prices drift between quote and order. Your quotation was priced on one day and the winding wire arrives on another, so record the metal basis in the quotation and compare it with the purchase.
That is a visibility need. You see the gap early. Electrical steel and winding wire arrive in coils and reels priced by weight, so the quoted metal weight per unit should sit beside the final consumption.
A short evaluation you can run in a week
Pick three real jobs: a repeat order, a custom one and a job revised after approval, then have each vendor enter them live. Watch how revisions, tests and shortages behave. Keep the scorecard open during every demo.
Then phone a user at another electrical manufacturer, not the salesperson, and ask which jobs, tests or shortage lists they still keep in spreadsheets.
Write findings against the four needs. Give the director one page, not a deck. A vendor who cannot show a locked revision, a serial linked test sheet, a shortage list and a metal basis field on your own jobs has not earned it.
Electrical ERP evaluation scorecard
Twelve scored items on a single page cover revision control, change notes, test templates, serial traceability, bought out shortages, supplier follow up, copper basis in quotations and dispatch holds. Columns record the vendor name, whether the feature was demonstrated live or only described, gaps found and a mark out of five.
Open a blank worksheet to printQuestions owners ask
Do small electrical makers need a full ERP?
Not always. A smaller shop may need only job costing, BOM control, stock and test records first, and can add purchase or accounts modules when a real problem asks for them. Start with whatever causes rework today.
Can an ERP handle copper price changes?
It can record the metal basis used in each quotation and the actual purchase cost of copper wire, strip and laminations, so quoted and actual sit side by side. It will not predict the market.
Should we customise the ERP for our products?
Light configuration such as test templates, extra fields and print formats is normal, but heavy customisation makes every later upgrade slower and harder to test. Ask the vendor which needs are code.
Who should be in the evaluation team?
Include someone from design, stores, purchase, quality, accounts and the managing director, because people who handle revisions and test sheets daily spot gaps that a scripted demo hides.