Skip to main content
GullySystem
← Back to the guide

Worksheet

Field ownership table

One page, four columns: data item, owner, system of record and update trigger. Rows cover device tags, part numbers, drawing revision, released PDF, order status, received quantity, wiring progress and test results. A final column marks which items flow from EPLAN to the project record and which flow back.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemData itemOwnerSystem of recordUpdate trigger

Cross out or rewrite any heading that does not fit your business. From the guide “EPLAN drawings versus a project record system: what each should hold”, www.gullysystem.com/blog/eplan-drawings-versus-a-project-record-system-what-each-should-hold