Worksheet
MVP milestone timeline
A five-row outline covers planning, design, development, testing and launch, and each row notes a typical duration range plus the main dependency that can stretch it. A checkbox on every row defines what “done” looks like at that stage, whether that is a signed-off design, a passed test run or an approved gateway account.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “How Long Does It Take to Develop an MVP?”, www.gullysystem.com/blog/how-long-does-it-take-to-develop-an-mvp