Worksheet
MVP cost breakdown worksheet
A worksheet gives each of the four cost components its own row: design, engineering, integration and testing, and release, with space to list your own features beside each. A separate block records running costs after launch, such as hosting, tool subscriptions and first-month fixes, which initial budgets so often forget entirely.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “How Much Does MVP Development Cost in India?”, www.gullysystem.com/blog/how-much-does-mvp-development-cost-in-india