Skip to main content
GullySystem
← Back to the guide

Worksheet

Part costing worksheet

The worksheet opens with inputs: cycle time, cavities, efficiency, press and shot weight. Its middle calculates parts per hour, machine cost, resin cost with yield, tool amortisation and extras per part. Actuals from the finished job sit beside each quoted figure at the foot.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “How to cost a plastic part when the tool and press are shared”, www.gullysystem.com/blog/how-to-cost-a-plastic-part-when-the-tool-and-press-are-shared