Skip to main content
GullySystem
← Back to the guide

Worksheet

Moulded part quote build sheet

A one-page template laid out as a cost stack. Rows run from compound weight and scrap to cavity count, cure time, press rate, trimming, post-cure, inspection, packing and tooling. Two columns sit side by side, quoted and actual, so a closed job shows exactly where the margin went.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “How to quote a rubber moulded part from compound to tooling”, www.gullysystem.com/blog/how-to-quote-a-rubber-moulded-part-from-compound-to-tooling