Worksheet
Baseline record sheet
Three blocks on a single worksheet. The first lists each journey as numbered steps with its test account. The second fixes the environment: staging size, data snapshot date, browser build and throttle profile. The third is a table with median, slow tail, error count and server CPU for each run, with a column per change.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “How to record a performance baseline before changing anything”, www.gullysystem.com/blog/how-to-record-a-performance-baseline-before-changing-anything