Worksheet
IoT pilot pass sheet
One page, signed before the pilot starts. The top block names the asset, its owner, the reference gauge and the shift lead who checks the data gap list each morning. The middle grid lists each criterion with its target, the method of measuring it, the result and a pass or fail tick. The bottom block logs paired readings by date, shift, gauge value, dashboard value and the difference between them, plus a signature line for the plant head.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “How to run an IoT pilot on one machine or one site”, www.gullysystem.com/blog/how-to-run-an-iot-pilot-on-one-machine-or-one-site