Worksheet
Job work challan ledger sheet
Printed on a single page, the sheet has two blocks. The outward block has challan number, date out, job worker, item code, quantity, unit, process and expected return date. The inward block has receipt date, delivery note number, accepted, rejected, wastage, balance and days outside. A totals row checks sent against received plus loss.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “ITC-04 job work records a Pune supplier needs before the return”, www.gullysystem.com/blog/itc-04-job-work-records-a-pune-supplier-needs-before-the-return