Worksheet
Precast bed and curing planner
A single sheet listing every element on its own line. Columns run from element mark and project to delivery date, stockyard days, strip date, curing method, cube test result, pour date, bed number and mould code. A second block lists moulds with their cast count and repair flag. A readiness strip at the right shows cage, inserts and release agent as ticks.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Mould, bed and curing schedule for a precast concrete yard”, www.gullysystem.com/blog/mould-bed-and-curing-schedule-for-a-precast-concrete-yard