Skip to main content
GullySystem
← Back to the guide

Worksheet

Branch connectivity and ownership worksheet

Print this as one grid. Columns cover link type, longest outage, power backup, who sets prices, who controls stock transfers, whether billing may pause, and the model you lean towards. A last column records the pull-the-cable test result for each site, with the date and the staff member who ran it.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “One shared system or synced branch installs: how to decide”, www.gullysystem.com/blog/one-shared-system-or-synced-branch-installs-how-to-decide