Skip to main content
GullySystem
← Back to the guide

Worksheet

Pilot read-out sheet

A worksheet of one page with three blocks. The first holds the assumption, pass line, pilot dates and tester count. The second is a table with columns for metric, target, result, and a note saying whether it came from the event log or an interview. The third lists build, change and stop in three columns, each with a tick box, the evidence for it and the owner of the next step.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Pilot results are in: how to decide to build, change or stop”, www.gullysystem.com/blog/pilot-results-are-in-how-to-decide-to-build-change-or-stop