Buyers want to trace one hose length back to its compound batch, reinforcement spool, mandrel and cure run, then see the pressure and hydrostatic test result for that length. Keep these linked under one length or lot number so a single lookup answers the whole complaint.
Which compound went into this length?
Buyers start here because the tube and cover compounds decide oil, heat and ozone resistance. Your record should name the compound code, the mixing batch and the mill date for both tube and cover.
Hold the cure data too. Press or autoclave temperature, time and the operator on that run show whether the hose was cured as specified. If a compound batch is later found faulty, you need to list every length that used it within minutes.
Never rely on a supplier’s certificate alone. Keep the compound lot you actually weighed out, because bags from two deliveries often sit side by side at the mixer. Mixed up lots are hard to separate afterwards.
- Tube and cover compound codes
- Mixing batch and mill date
- Rheometer result for the batch
- Cure cycle and cure vessel
What reinforcement and mandrel batch was used?
Reinforcement is the textile braid, spiral wire or steel cord that carries the pressure. Customers ask for the supplier lot, the spool number and the number of plies or spirals. A weak spool is the classic cause of a burst well below rating.
The mandrel matters for bore size and surface finish. Record the mandrel number and its diameter check, since a worn mandrel gives a rough bore and uneven wall. Link it all to the length number printed or stencilled on the hose.
Wrapped hose adds the fabric or tape lot. Cured hose adds the curing vessel and the wrap tension used. Write them all down.
What should the pressure test record show?
Each tested length needs a proof pressure, a hold time and a recorded result of pass or fail. Add the gauge number and its calibration date, because an auditor will ask whether the gauge could be trusted. Add the tester’s name and the time.
Burst tests are done on samples, so record which length was sacrificed and what that result says about its neighbours. Be clear in the record about which standard the test followed. Buyers read that line first.
- Proof pressure and hold time
- Gauge number and calibration date
- Sample burst result and lot covered
- Standard the test followed
What belongs in the hydrostatic and dimension records?
Hydrostatic testing fills the hose with water, applies the specified pressure and checks for leaks, swelling or length change. Record the measured change in length and the outside diameter before and after. Note any visible weeping at the crimp or cuff.
Add the final inspection sheet: inside diameter, wall thickness, length and marking check. Attach a photo of the stencil. Disputes often turn on whether the hose in the field was ever marked the way the buyer expects.
A buyer who finds a leaking cuff wants to know if the hose was tested wet or dry, and at what temperature the water stood. State it. Short answers close complaints quickly, and vague ones open a long email chain.
Make one lookup answer a complaint
When a hose fails in the field, the buyer sends a length number or a photo of the marking. You should reach compound, reinforcement, mandrel, cure and test records from that one number without hunting through folders.
Test it on a past order this week. Pick one shipped length and stand over a stopwatch while someone gathers every record. Whatever slows them down is the gap to fix first.
Hose length traceability sheet
Printed on one page for each length or lot. Block one lists length number, order, customer and marking. Block two links tube compound batch, cover compound batch, reinforcement spool, mandrel number and cure run. Block three records proof pressure, hold time, gauge and sample burst. Block four holds final dimensions and an inspector sign-off.
Open a blank worksheet to printQuestions owners ask
Do buyers need a record for every single length?
It depends on the contract. Many accept a lot record with sample tests, while safety critical hoses often need each length tested and linked individually.
How long should hose records be kept?
Follow your customer contract and the standard you build to. Many buyers specify years, so ask each customer and keep the longest period in force.
What is the difference between proof and burst testing?
Proof testing applies a set pressure to a production length and it must hold. Burst testing is destructive and done on samples to confirm the real margin.
Can paper travellers still work?
They can, but retrieval is slow once lots mix. Software helps by letting you search by length number and see every linked record at once.