Worksheet
Robot cell commissioning tracker
Five blocks in order make up this single-sheet tracker: site acceptance, safety validation, teaching, cycle proving and punch list. Each block has columns for check item, result, tester, date and attached photo. The last block adds owner, due date and a safety-or-cosmetic flag for every open item.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Check item | Result | Tester | Date | Attached photo |
|---|---|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Site commissioning plan for a robotic cell, step by step”, www.gullysystem.com/blog/site-commissioning-plan-for-a-robotic-cell-step-by-step