Skip to main content
GullySystem
← Back to the guide

Worksheet

Job work lot tracker

One sheet, one row per lot. Columns: challan number, issue date, processor, part and batch, process, quantity out, due date, good received, scrap weight, rejected, balance, invoice number and quantity difference. A second block ranks open lots by age and processor so overdue lots at a furnace, plating tank or machine shop stand out at once.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Tracking material sent out for job work: challan, return and billing”, www.gullysystem.com/blog/tracking-material-sent-out-for-job-work-challan-return-and-billing