Skip to main content
GullySystem
← Back to the guide

Worksheet

Part and routing worksheet

A worksheet listing each live part number with its current revision, material grade, bar size, operations in order, machine per operation and inspection points. Fill it in with the setter and the inspector together. Blank cells show what the floor still keeps in memory.

Name: ______________________   Business: ______________________   Date: ______________

Use the sheet to agree the next action

Start with one example from your own work. Mark anything you cannot verify, name the person who can confirm it and record the next action before adding more rows. Use fictional or redacted details when sharing the sheet outside your team.

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “What a CNC Job Shop Should Settle Before Moving Job Cards Off Paper”, www.gullysystem.com/blog/what-a-cnc-job-shop-should-settle-before-moving-job-cards-off-paper