Worksheet
Chemical plant software requirements sheet
The worksheet fits one sheet of paper and has four columns: record, fields needed, who enters it and what it blocks. Rows cover formula, batch, incoming lot, lab result, safety data sheet, tanker load and drum load, and a final row lists your last five floor errors. Fill it in once per plant.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “What Chemical Manufacturing Software Needs to Handle”, www.gullysystem.com/blog/what-chemical-manufacturing-software-needs-to-handle