Worksheet
Unit cost posting sheet
A page listing one machine on each row and columns for asset number, period, meter hours, depreciation, fuel, repairs, tyres or tracks, insurance, operator and total. The last two columns hold the cost per working hour and the standby rate, and a second block lists job, hours worked and amount charged.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “What Is Unit Level Costing for Construction Equipment”, www.gullysystem.com/blog/what-is-unit-level-costing-for-construction-equipment