Skip to main content
GullySystem
← Back to the guide

Worksheet

Unit cost posting sheet

A page listing one machine on each row and columns for asset number, period, meter hours, depreciation, fuel, repairs, tyres or tracks, insurance, operator and total. The last two columns hold the cost per working hour and the standby rate, and a second block lists job, hours worked and amount charged.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “What Is Unit Level Costing for Construction Equipment”, www.gullysystem.com/blog/what-is-unit-level-costing-for-construction-equipment