Worksheet
Packing bench gate checklist
A single page for each packing bench. It lists five tick boxes in order: lot scanned, certificate printed, cold rule and ship day met, safety data sheet inside, hazard label on the carton. A reason code column sends failures to the hold shelf, beside a supervisor initial field, and the back lists the cold rule for each carrier route.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Why a lab order arrives without the certificate or the cold pack”, www.gullysystem.com/blog/why-a-lab-order-arrives-without-the-certificate-or-the-cold-pack