Worksheet
Release-time material check sheet
One row per material line. Columns cover job number, item, grade or size, required quantity, scrap allowance, free stock, reserved stock, shortfall and date needed. A header block records the release date and who checked it, and a footer lists the purchase actions raised against any shortfall.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Why material runs short after a job has started”, www.gullysystem.com/blog/why-material-runs-short-after-a-job-has-started