Skip to main content
GullySystem
← Back to the guide

Worksheet

Release-time material check sheet

One row per material line. Columns cover job number, item, grade or size, required quantity, scrap allowance, free stock, reserved stock, shortfall and date needed. A header block records the release date and who checked it, and a footer lists the purchase actions raised against any shortfall.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Why material runs short after a job has started”, www.gullysystem.com/blog/why-material-runs-short-after-a-job-has-started