Estimate versus actual variance sheet
A single worksheet gives each finished job its own row and each cost line its own column. The columns are stock, make-ready sheets, run spoilage, finishing hours, outside supplier, delivery and total. Each column holds estimate, actual and difference. A last column names the main cause, such as loose register, substitute stock or supplier surcharge.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Why print estimates and actual job costs never match”, www.gullysystem.com/blog/why-print-estimates-and-actual-job-costs-never-match