Worksheet
Changeover timing sheet
Each row of this sheet is one changeover. Columns hold press, die in and out, lift time, setup time, first off approval time, wait time, wait reason and trial count. A summary strip at the foot ranks wait reasons by total hours, so the first fix is obvious at a glance.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Why stamping die changeover takes so long and how to measure it”, www.gullysystem.com/blog/why-stamping-die-changeover-takes-so-long-and-how-to-measure-it