Skip to main content
GullySystem
← Back to the guide

Worksheet

Revision release checklist

A printed sheet is headed by job number, client name, designer and revision letter, so the paper trail starts at the top of the page. Four blocks follow for client sign-off, designer check against site measurements, stock check for boards and hardware, and the release record with the date and name. A bottom table lists each superseded revision with its date, its reason and the person who retired it from use on the shop floor.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Why the old drawing revision reaches the factory”, www.gullysystem.com/blog/why-the-old-drawing-revision-reaches-the-factory