Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for 3D printing companies.

A checklist built from how 3D printing companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • File intake and revision history
  • Quotes from print hours and material
  • Build plate and printer queue
  • Material spools and resin lots
  • Post-processing route
  • Inspection and failed builds
  • Printer maintenance log

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For estimators
  • For production leads
  • For printer operators
  • For quality and finishing staff

Reports to ask for

Ask to see each one with your own sample data.

  • Machine hours booked against available hours by printer
  • Quotes sent, approved and lapsed by revision
  • Material grams drawn against grams billed, by material
  • Failed builds by cause, printer and material
  • Parts inspected, passed and sent for rework
  • Printers due for nozzle, vat or calibration service
  • Unpaid invoices by customer

Systems it may need to connect to

Note which ones you already run.

  • Email
  • SMS
  • WhatsApp and other messaging
  • Slicer export files
  • Courier tracking
  • Payment gateway
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Can it work with several printer types at once?
  • Does a quote stay tied to a model revision?
  • How is material consumption tracked?
  • Can we record failed prints and their cost?
  • Do customers get a login?
  • Does it read geometry from a model file?
  • Can printer maintenance be scheduled?
  • Can we reprint a part from an earlier order?
  • How much does it cost?
  • Can the data be exported later?
  • How long before the bureau is quoting and printing on it?
  • What does the bureau gather ahead of the build?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • A revised file is printed against an old quote
  • Spool weight is guessed at quoting
  • Failed builds are not costed
  • Finishing steps lose their order
  • Printer maintenance follows memory

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

File intake and revision history

Which version applies to work that has already started?

Use a revised example from “File intake and revision history” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Inspection and failed builds

Who decides whether a failed result blocks the next step?

For “Inspection and failed builds”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Prefer to talk it through? See the 3D printing companies page.