Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for concrete block manufacturers.

A checklist built from how concrete block manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Mix design register
  • Press run log
  • Curing yard tracking
  • Strength test records
  • Delivery and breakage notes
  • Contractor accounts and dues

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For press operators
  • For yard supervisors
  • For dispatch and drivers
  • For accounts

Reports to ask for

Ask to see each one with your own sample data.

  • Pallets pressed by machine, mould and shift, with rejects
  • Cement and fly ash consumed against blocks pressed
  • Stacks standing in each bay by days cured
  • Cube crushing and dimension results by lot
  • Deliveries by builder and size, with breakage reported
  • Builder dues, oldest delivery first
  • Pallet and mould movement, liner wear and repairs

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp
  • SMS
  • Email
  • Weighbridge entry
  • Accounting export
  • Payment gateway

Questions for any vendor

Put these to every supplier you are comparing.

  • Can the mix be changed without losing the old one?
  • How does it know when a stack is ready to leave?
  • Can we run more than one press?
  • Where do strength test results go?
  • Does it handle breakage claimed after delivery?
  • Can we count the pallets that go out with customers?
  • Is the weighbridge or a scale connected?
  • What does it cost and how do we see it first?
  • Who helps if the yard changes its product range?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Mix changes are not written down
  • Curing days are guessed
  • Pallet counts disagree with the delivery
  • Test results sit on loose sheets
  • Contractor accounts run on rough counts

Prefer to talk it through? See the concrete block manufacturers page.