Requirements checklist

What to ask for when choosing software for data centre operators.

A checklist built from how data centre operators work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Customer contracts and capacity
  • Rack and cable register
  • Power and environment readings
  • Visitor and access control
  • Deliveries and remote hands tickets
  • Facility maintenance calendar

Roles that need their own access

Who logs in, and what each person may see or change.

  • For sales and capacity planners
  • For facilities engineers
  • For technicians on customer tasks
  • For security and reception
  • For customers

Reports to ask for

Ask to see each one with your own sample data.

  • Power committed, drawn and free by hall, row and rack
  • Rack and cage occupancy with reserved holds and expiry dates
  • Cross-connects by carrier, customer and monthly charge
  • Remote hands tasks by customer, with included hours used
  • Visitor log by customer, building and date
  • Maintenance tasks done and due by system and hall
  • Contracts by renewal date, with power and space used

Systems it may need to connect to

Note which ones you already run.

  • Power and environment monitoring export
  • Email
  • SMS
  • Access control badge list
  • Accounting export
  • Payment gateway

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it replace our building management or DCIM system?
  • How are power overage charges worked out?
  • Can customers see their own racks and usage?
  • Can we hold space for a prospect before signing?
  • How do cross-connects get recorded?
  • Does it control door locks?
  • Can existing rack lists be loaded?
  • Who owns the facility data?
  • What does it cost?
  • How long before the facility is running on it?
  • What should the operator prepare before work starts?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Power is sold faster than it is measured
  • Rack and cable records disagree with the floor
  • Access lists go stale
  • Remote hands work is billed late
  • Maintenance proof is scattered

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Facility maintenance calendar

What proves that a planned task was actually completed?

Select an overdue entry in “Facility maintenance calendar”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Visitor and access control

Can an ordinary account reach a record outside its allowed scope?

For “Visitor and access control”, agree two accounts with different permissions and test direct requests. Record the expected refusal and include exported or downloaded data in the assessment.

Background reading: OWASP: authorisation checks

Prefer to talk it through? See the data centre operators page.