Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for engine component manufacturers.

A checklist built from how engine component manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Customer schedules and call-offs
  • Drawing and revision control
  • Casting and forging lot traceability
  • Machining route and first-off
  • Gauge and hardness results
  • Outside process tracking

Roles that need their own access

Who logs in, and what each person may see or change.

  • For plant heads
  • For planners
  • For machine operators
  • For the gauge room
  • For despatch

Reports to ask for

Ask to see each one with your own sample data.

  • Lots by route step and machine
  • First-off approvals by part and offset change
  • Rejection by part, dimension and cutting tool
  • Outside process trays out, with days away and certificate status
  • Call-off schedule against despatch by customer
  • Tray balance by customer
  • Gauge and master ring calibration due dates

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp
  • Measuring equipment file import
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Can it follow a lot from casting to tray?
  • How are drawing revisions kept apart?
  • Can first-off approval stop a run?
  • Can it take readings from the coordinate measuring machine in our gauge room?
  • Can outside heat treatment be tracked?
  • What happens when a customer reports a bad lot?
  • How is pricing worked out?
  • Can we take our records out?
  • How long before machine operators are booking lots on it?
  • What should the plant gather before work begins?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Casting lots lose their identity
  • Drawing revisions overlap
  • Gauge results sit apart from the lot
  • Outside processes are hard to chase
  • Call-off changes reach the floor late

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Drawing and revision control

Which version applies to work that has already started?

Use a revised example from “Drawing and revision control” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Casting and forging lot traceability

Can you follow a suspect input through to the affected deliveries?

Pick one real record from “Casting and forging lot traceability”. Ask the team to trace its origin and identify the later work or deliveries it affected, including any split quantities.

Background reading: ERPNext: forward and backward traceability

Prefer to talk it through? See the engine component manufacturers page.