What to ask for when choosing software for eV component manufacturers.
A checklist built from how eV component manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Cell lots and grading
- Module and pack build
- Firmware and board records
- End-of-line testing
- Rework and defect codes
- Variant, label and despatch control
Roles that need their own access
Who logs in, and what each person may see or change.
- For plant managers
- For stores
- For line operators
- For test and rework staff
- For dispatch
Reports to ask for
Ask to see each one with your own sample data.
- Packs built by variant and serial range
- Cell lots by module, tray and pack
- Hipot and balance failures by bay and shift
- Rework causes by part and defect code
- BMS firmware versions by pack serial
- Storage charge of finished packs on the shelf
- Field queries traced to a cell lot
Systems it may need to connect to
Note which ones you already run.
- Grading machine file import
- Accounting export
Questions for any vendor
Put these to every supplier you are comparing.
- Can it trace a pack to its cells?
- Does it stop mixed cell lots in a module?
- Can firmware versions be tracked?
- What about end-of-line tests?
- Is it limited to battery packs?
- Can grading machine files be imported?
- What affects the cost?
- Can we export serial histories?
- How long before the pack line records on it?
- What must the plant bring before we begin?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Cycler grading files sit on one PC
- Weld and torque records carry no pack serial
- BMS firmware versions rest on a note
- End-of-line failures leave no defect trail
- Variants multiply across one bench
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Variants multiply across one bench
What happens if the same event arrives twice or arrives late?
For “Variants multiply across one bench”, request a duplicate and delayed-message test using harmless data. Compare the final record with the source before the connector is allowed to post live entries.
Background reading: Stripe: webhook delivery behaviour
Prefer to talk it through? See the eV component manufacturers page.
