Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for land surveyors.

A checklist built from how land surveyors work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Survey requests and document collection
  • Crew and instrument scheduling
  • Measurement sheets and field notes
  • Drawings and revisions
  • Plot subdivision and layout work
  • Fee stages and billing
  • Archive by location
  • Control point and benchmark register
  • Boundary objections log
  • Instrument calibration log

Roles that need their own access

Who logs in, and what each person may see or change.

  • For the principal surveyor
  • For the office and reception
  • For field surveyors and helpers
  • For draughtsmen
  • For accounts

Reports to ask for

Ask to see each one with your own sample data.

  • Open survey jobs by stage and surveyor
  • Papers pending by job and client
  • Field visits scheduled by crew and instrument
  • Drawings under review and awaiting client sign-off
  • Layout plots staked, checked and handed over
  • Fees billed, received and outstanding by job
  • Completed jobs not yet billed

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp
  • SMS
  • Email
  • Payment links and bank transfer
  • Ledger export
  • Cloud drive for drawing and instrument files

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it draw plans or process instrument data?
  • Can we load years of past surveys into it?
  • How does it deal with a site that has no signal?
  • Can one person see only their own jobs?
  • Does it hold village records or fetch them online?
  • How is a survey system priced?
  • How long does a team need to learn it?
  • Who owns our survey data if we leave?
  • What should we collect before the work begins?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Old surveys cannot be found
  • Documents trickle in
  • Field sheets and drawings drift apart
  • Crew and instruments clash
  • Fees and layout queries eat time

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Measurement sheets and field notes

Do purchasing, operating and billing quantities use the same unit?

Check the measurement unit and rounding used in “Measurement sheets and field notes”. Compare the result with a known sample before accepting a converted quantity or calculated charge.

Background reading: ERPNext: units of measure

Drawings and revisions

Which version applies to work that has already started?

Use a revised example from “Drawings and revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Prefer to talk it through? See the land surveyors page.