What to ask for when choosing software for plastic extrusion companies.
A checklist built from how plastic extrusion companies work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Profile and pipe register
- Line run log
- Compound and additive stock
- Dimensional checks
- Die and tooling record
- Bundle tagging and dispatch
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners and plant managers
- For planners
- For line operators
- For the tool room
- For quality staff
Reports to ask for
Ask to see each one with your own sample data.
- Line output in kilograms per hour against the quoted rate
- Scrap and purge by cause, line and colour
- Compound, masterbatch and regrind consumed per order
- Dies ranked by metres since polishing
- Dimensional check results by section and run
- Cut-length orders still open, in metres and bundles
- Bundles dispatched by buyer with run references
Systems it may need to connect to
Note which ones you already run.
- Tablet entry at the line
- Barcode label printer
- Accounting export
Questions for any vendor
Put these to every supplier you are comparing.
- Does it work for pipe and sheet as well as profile?
- How does it show the cost of a colour change?
- Can we trace a bundle back to a recipe?
- Can two buyers share one run?
- How is die wear handled?
- Can line speed come from the machine?
- Can the data be exported?
- What does the demo cover?
- What support exists after go-live?
- What decides the cost for an extrusion plant?
- When could the lines log runs on tablets?
- What do planners and the tool room need ready?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Start-up scrap is never costed
- Dimensions are measured and then lost
- Compound lots blend unseen
- Dies are not tracked
- Cut-length orders mix up on the floor
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Bundle tagging and dispatch
Can a partial delivery be distinguished from a completed order?
For “Bundle tagging and dispatch”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.
Background reading: ERPNext: delivery notes
Compound and additive stock
What happens to movements entered while a count is being checked?
For “Compound and additive stock”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.
Background reading: ERPNext: stock reconciliation
Prefer to talk it through? See the plastic extrusion companies page.
