Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for rubber hose manufacturers.

A checklist built from how rubber hose manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Compound batch register
  • Mandrel and reinforcement planning
  • Cure cycle log
  • Proof and burst test records
  • Assembly and coupling jobs
  • Offcut and coil stock

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For planners
  • For the mixing and extrusion crew
  • For test bench operators
  • For the crimp bench and dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Orders by hose type, bore, coupling and promised date
  • Compound batches and the coils and lengths made from each
  • Mandrel use by bore across the autoclave week
  • Proof and burst results with rejects by cause and hose type
  • Braid reels and spiral wire spools issued against orders
  • Coupling and ferrule use by assembly drawing and revision
  • Offcuts and coils held by bore and grade

Systems it may need to connect to

Note which ones you already run.

  • Barcode and label printers
  • Email
  • Messaging for order updates
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Can it follow one hose back to its compound batch?
  • Does it plan mandrels?
  • How are autoclave loads recorded?
  • Can pressure test limits differ by hose?
  • Do crimped assemblies follow the drawing?
  • What happens to a hose that fails the proof test?
  • Can our buyers receive test certificates?
  • How does bulk hose differ from assemblies?
  • What will a quotation depend on?
  • Can records be taken out of the system later?
  • What governs the start-up for a hose plant?
  • What records should the plant put together?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • A field failure cannot be traced
  • Mandrels are double-booked
  • Offcuts and short lengths vanish
  • Assembly drawings drift
  • Test certificates are typed by hand

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Mandrel and reinforcement planning

Which observation would change the proposed scope?

For “Mandrel and reinforcement planning”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

Offcut and coil stock

What happens to movements entered while a count is being checked?

For “Offcut and coil stock”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

Prefer to talk it through? See the rubber hose manufacturers page.