Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for toy manufacturers.

A checklist built from how toy manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Item tree with parts and accessories
  • Mould and cavity register
  • Resin, colour and paint lots
  • Moulding, decoration and assembly runs
  • Sample tests and release
  • Buyer orders and carton packing
  • Season planning view

Roles that need their own access

Who logs in, and what each person may see or change.

  • For factory owners
  • For planners
  • For toolroom staff
  • For moulding and assembly supervisors
  • For the quality desk

Reports to ask for

Ask to see each one with your own sample data.

  • Shots and rejects by mould, cavity and shift
  • Mould service due, by shot count
  • Granule and paint lots consumed against moulded and decorated batches
  • Parts out with embroidery and painting units, by delivery note and age
  • Assembly output and short screws, wheels and decals by line
  • Drop, pull and torque results and lots on hold
  • Open buyer orders against packed cartons and ship window

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp or other messaging
  • Barcode and label printers
  • Tablet entry at the line
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Can one toy have parts made in several places?
  • How are moulds with several cavities handled?
  • Can we record colour changes on a press?
  • What happens when a sample fails a test?
  • Do buyers get their own carton labels?
  • Does it handle battery operated and electronic toys?
  • Can our current parts and orders be loaded?
  • Can the system show the cost to make an item?
  • Who owns the production records?
  • How do we see a price?
  • How soon could the press plan reflect real mould condition?
  • What should planners and the toolroom bring?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Which resin lot is in this carton?
  • Mould use is guessed
  • Decoration and subcontract counts drift
  • Test reports are filed apart from production
  • Seasonal orders collide on shared tools

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Test reports are filed apart from production

What does one row mean before totals are combined?

Choose one period in “Test reports are filed apart from production” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Season planning view

Which observation would change the proposed scope?

For “Season planning view”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

Prefer to talk it through? See the toy manufacturers page.