Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for toy manufacturers.

A checklist built from how toy manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Item tree with parts and accessories
  • Mould and cavity register
  • Resin, colour and paint lots
  • Moulding, decoration and assembly runs
  • Sample tests and release
  • Buyer orders and carton packing
  • Season planning view

Roles that need their own access

Who logs in, and what each person may see or change.

  • For factory owners
  • For planners
  • For toolroom staff
  • For moulding and assembly supervisors
  • For the quality desk

Reports to ask for

Ask to see each one with your own sample data.

  • Shots and rejects by mould, cavity and shift
  • Mould service due, by shot count
  • Granule and paint lots consumed against moulded and decorated batches
  • Parts out with embroidery and painting units, by delivery note and age
  • Assembly output and short screws, wheels and decals by line
  • Drop, pull and torque results and lots on hold
  • Open buyer orders against packed cartons and ship window

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp or other messaging
  • Barcode and label printers
  • Tablet entry at the line
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Can one toy have parts made in several places?
  • How are moulds with several cavities handled?
  • Can we record colour changes on a press?
  • What happens when a sample fails a test?
  • Do buyers get their own carton labels?
  • Does it handle battery operated and electronic toys?
  • Can our current parts and orders be loaded?
  • Can the system show the cost to make an item?
  • Who owns the production records?
  • How do we see a price?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Which resin lot is in this carton?
  • Mould use is guessed
  • Decoration and subcontract counts drift
  • Test reports are filed apart from production
  • Seasonal orders collide on shared tools

Prefer to talk it through? See the toy manufacturers page.