Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for well-drilling companies.

A checklist built from how well-drilling companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Enquiries and site surveys
  • Quotations by metre and item
  • Drilling jobs and rig schedule
  • Daily drilling log
  • Casing, pipe and bit store
  • Rig maintenance and fuel
  • Yield tests and completion reports

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For surveyors and estimators
  • For drillers
  • For store keepers
  • For the office and accounts

Reports to ask for

Ask to see each one with your own sample data.

  • Metres drilled each month, split by rig and formation
  • Casing and drill pipe issued, borehole by borehole
  • Quotations won, lost and still open, with quoted depth beside depth drilled
  • Services falling due by hours run, and repairs for each machine
  • Diesel drawn by each rig and its fuel cost per metre
  • Boreholes awaiting a yield test before the completion report
  • Amounts owed, customer by customer, oldest first

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp or other messaging
  • SMS
  • Email
  • Payment gateway
  • Accounting package export
  • Spreadsheet import

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it suit water boreholes and geotechnical drilling?
  • Can a driller fill in the log on a phone at the rig?
  • How are metres billed when depth differs from the quotation?
  • Can casing be tracked by size and length?
  • Does it handle rig servicing?
  • Can pump installation be billed apart from drilling?
  • Can the completion report be given to the customer?
  • What does a demonstration involve?
  • Who looks after changes to rates and forms?
  • Can I take my records out if I stop using it?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • The drilling log is on paper
  • Quotes and final bills differ
  • Casing and bits are not tracked
  • Rigs lose time to repairs
  • Fuel and crew costs are spread thin

Prefer to talk it through? See the well-drilling companies page.