Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for well-drilling companies.

A checklist built from how well-drilling companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Enquiries and site surveys
  • Quotations by metre and item
  • Drilling jobs and rig schedule
  • Daily drilling log
  • Casing, pipe and bit store
  • Rig maintenance and fuel
  • Yield tests and completion reports

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For surveyors and estimators
  • For drillers
  • For store keepers
  • For the office and accounts

Reports to ask for

Ask to see each one with your own sample data.

  • Metres drilled each month, split by rig and formation
  • Casing and drill pipe issued, borehole by borehole
  • Quotations won, lost and still open, with quoted depth beside depth drilled
  • Services falling due by hours run, and repairs for each machine
  • Diesel drawn by each rig and its fuel cost per metre
  • Boreholes awaiting a yield test before the completion report
  • Amounts owed, customer by customer, oldest first

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp or other messaging
  • SMS
  • Email
  • Payment gateway
  • Accounting package export
  • Spreadsheet import

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it suit water boreholes and geotechnical drilling?
  • Can a driller fill in the log on a phone at the rig?
  • How are metres billed when depth differs from the quotation?
  • Can casing be tracked by size and length?
  • Does it handle rig servicing?
  • Can pump installation be billed apart from drilling?
  • Can the completion report be given to the customer?
  • What does a demonstration involve?
  • Who looks after changes to rates and forms?
  • Can I take my records out if I stop using it?
  • How long before the rigs are logging on it?
  • What should the drilling company prepare before work starts?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • The drilling log is on paper
  • Quotes and final bills differ
  • Casing and bits are not tracked
  • Rigs lose time to repairs
  • Fuel and crew costs are spread thin

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Yield tests and completion reports

What does one row mean before totals are combined?

Choose one period in “Yield tests and completion reports” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Quotations by metre and item

Which assumptions stop being valid when the quotation changes?

For “Quotations by metre and item”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Prefer to talk it through? See the well-drilling companies page.