Skip to main content
GullySystem
Real estate and construction

Estimate/Quotation Management for Elevator companies

Keep itemised estimates and their approved revisions together.

Finance & Accounting

Does this function belong in your operation?

Use when scope and prices are agreed before an order.

A buyer asks for pricing before confirming work.

Quotes for new lifts and modernisation list capacity, floors, speed and door type. Machine and controller options sit beside the price. Architects and builders can revise the choice.

Bring the records the workflow depends on.

  • Items and units
  • Rates and tax settings
  • Approval terms

Outputs to check

  • Versioned estimate document
  • Approval and acceptance history
  • Accepted billing or order input

Follow the estimate/quotation management workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Record the requirement

    Capture scope, quantities and the customer's requested terms.

  2. 2. Prepare the estimate

    Use approved units, rates and tax settings.

  3. 3. Review exceptions

    Approve discounts, exclusions and nonstandard terms.

  4. 4. Issue and revise

    Retain the version sent and each subsequent change.

  5. 5. Record acceptance

    Link the agreed version to order creation or final billing.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Sales executive

Sees quotes waiting to be sent, quotes waiting on the client, and today’s follow-up list.

Estimator

Builds the costing behind the quote from measurements, material and labour, and keeps it beside the drawing.

Owner

Sees what went out this week, at what margin, and which discounts were given without being asked for.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Customer changes quantity

Save a revision and recalculate affected lines before acceptance.

Expired validity

Require the price and terms to be reviewed before using the estimate.

Discount beyond authority

Hold the revision for approval and retain the original proposed amount.

Can this work independently?

An estimate can be prepared independently from entered items and rates. Item catalogues, pricing and tax settings improve consistency when connected. Order creation and invoicing are downstream processes; acceptance should preserve the agreed version rather than overwrite the estimate with later rates.

Systems and records it connects with

  • Lead management: Enquiry sources, owners and qualification decisions.
  • Proforma invoice: Provisional supply amounts and related advance requests.
  • Invoice management: Issued invoice references, line amounts and outstanding balances.
  • Price lists and schemes: Effective-dated rates and customer eligibility rules.

Configure, test and introduce the workflow.

  • We read quotations you sent recently. You pass over the rate list and a few finished quotes, and we sketch the screen layout.
  • Items, units, discount limits and standard terms go in. Proofreading the list is yours. The printed quotation is matched to your letterhead. A draft PDF is sent for your comments.
  • Executives raise real quotes in parallel with the old method. Mismatches are logged and discussed. New enquiries start in the system. Estimators and executives get a short session each.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Earlier revisions remain available.
  • Totals use approved settings.
  • The accepted version is identifiable.
Elevator companies

How the business operates.

An installed lift is a contract that runs for decades. Monthly maintenance, licence renewal and a night call from a watchman are where a lift company’s service is judged.

Lift register

Record each lift by building, make, load, floors served, controller, installation date, licence number and contract type, so any call traces to a machine.

Preventive maintenance schedule

Plan monthly visits by technician and route, with a checklist closed by the technician’s signature.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Lift and building records. Hold each lift with its machine number, make, model, load, speed, floors served, drive type, controller and the building and wing it stands in. A gearless machine is told apart from a geared one at a glance.
  • Enquiries and site surveys. Record enquiries from builders, societies and facility teams, with survey notes on the shaft, pit, headroom and the machine already installed. Photographs of the hoistway and machine room stay with the enquiry.
  • Quotations and modernisation proposals. Quote for a new lift, a repair or a modernisation, listing the parts and labour offered, from a new controller to rope and sheave replacement. Track the quotation to an order, with revisions kept on file.
  • Installation project stages. Follow an erection job through guide rails, machine, counterweight, car, doors, wiring, controller and trial runs. Each stage carries its supervisor and dates. Delays show against the stage that caused them.

Operational bottlenecks to check

Night calls reach the wrong technician

The office phone rings through to a technician who does not cover that area, and the people in the lift wait. The time of the call is not written down.

Service visits cannot be shown to have happened

The association says nobody came, and the only proof is a paper slip in a technician’s bag. The office cannot answer.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry and site survey

    A builder, society or facility manager asks for a lift or for service cover. The survey notes the shaft, pit depth, headroom, floors served and the existing machine where there is one, with the machine room dimensions.

  2. 2. Quotation and order

    A quotation covers the lift or the cover offered, with spares and labour included. When it is accepted, the order and payment stages are recorded against the building. Nothing is retyped.

  3. 3. Installation and commissioning

    Erection runs in stages from guide rails, machine and counterweight to car, doors, controller and trial runs. Commissioning and handover close the job, with the governor and buffer test records filed against the lift.

  4. 4. AMC and routine service

    The lift goes on a contract with its visit frequency. Each routine visit opens with a checklist for the machine room, car, hoistway and landing doors, and closes with the technician’s signature. Lubrication is logged.

  5. 5. Breakdown call

    The desk logs the caller, the lift and the fault reported. A technician is sent, and the fault found and the parts used are entered. The call is closed with the outcome, and a trapped passenger is noted as a rescue.

  6. 6. Billing and renewal

    AMC instalments, repair work and chargeable spares are invoiced with tax. Renewal dates appear in advance, so the office can speak to the committee or the facility team before cover lapses.

Industry reports to connect with

  • Lifts under contract by building and cover type
  • Routine visits done against visits due, by route
  • Breakdown calls by lift, with the fault found
  • Spares issued by lift and by technician

Questions before implementation.

When should elevator companies consider estimate/quotation management?

Use when scope and prices are agreed before an order. A buyer asks for pricing before confirming work.

What should we bring to the requirements discussion?

Bring anonymised examples of Items and units; Rates and tax settings; Approval terms. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Keep itemised estimates and their approved revisions together. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

An estimate is not a tax invoice or proof of acceptance.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Earlier revisions remain available. Use this check when reviewing the first working version.

Talk to us

Discuss estimate/quotation management for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements