Skip to main content
GullySystem
Manufacturing

Business solutions for Industrial enclosure manufacturers

Explore software for work such as “Standard wall-mount and floor-standing enclosures”. Review each business function below, including when it fits and what to check before implementation.

Industrial enclosure manufacturers

How the business operates.

An enclosure manufacturer makes wall boxes, floor standing cabinets, junction boxes and operator consoles from sheet metal. Most are bought by panel builders who fit switchgear, drives and controllers inside. The box must match the drawing. Millimetres matter.

Standard range and custom quotes

Hold a catalogue of stock sizes with prices, and build custom quotes from sheet area, bends, cut-outs, accessories and finish.

Drawing and cut-out records

Keep the drawing revision, the cut-out list and the punching programme for each unit, so a repeat order is made to the same pattern.

Sheet nesting and material issue

Record sheet grade, thickness and size issued to a nesting plan, with offcuts returned to the rack and counted in the next plan.

Press brake and welding stages

Track each unit through punching, bending, welding and grinding, with the machine and the operator noted at every stage.

Coating shade and batch record

Link each order to its shade card and powder batch, and record the cure date and the coating thickness check from the coater.

Accessories and packing

List locks, gaskets, mounting plates and glands per unit, then pack against that list and print a packing list per carton.

Dispatch and invoicing

Bill from the packed order, with the carton list attached, and keep a running balance for every panel builder.

Offcut and remnant sheet stock

Offcuts are logged by grade, thickness and size. The nesting programmer picks them before cutting a new sheet. Scrap sold by weight is entered at the yard gate.

Punch, die and tooling register

Punches, dies and press brake tooling are listed with wear and last sharpening. The press operator sees what a bend needs. A worn die is pulled before it marks the panel.

Customer drawing approvals

Drawings sent to the panel builder for approval carry the signed revision. The shop does not cut until the approved revision is marked. Late changes reopen the approval.

The records that hold the operation together.

  • Enclosure catalogue. Hold stock sizes with height, width and depth, sheet thickness, mounting options and price, alongside the shelf quantity for each item. Reorder levels flag the sizes that sell fastest.
  • Custom quotations. Price special units from developed sheet area, bends, cut-outs, weld length, fittings and finish, using your own rates. Every revision is kept beside the one before.
  • Drawing and cut-out register. Store the drawing revision and the cut-out list for each unit, with the turret or fibre laser programme name linked to the order. A reorder opens the approved pattern.
  • Sheet stock and offcuts. Record sheets by grade, thickness and size, issue them to nesting plans and book usable offcuts back as measured remnants. The next plan draws from the rack first.
  • Fabrication stage tracker. Track every order through punching, bending, welding, grinding and degreasing, with the machine and operator at each stage. Supervisors see what is waiting at the brake.
  • Powder coat shade register. Keep the shade card, powder batch, cure record and film thickness check against each order, whether coated in house or at an outside coater. A repeat order opens the same details.
  • Accessories and bill of parts. List locks, gaskets, mounting plates, gland plates and earthing studs for each unit, and issue them from stock against the order. Shortages show before the packing bench.
  • Ingress rating test log. Note any IP test a buyer asks for under IEC 60529, with the unit tested, the result entered by your staff and the report attached. The software stores it and certifies nothing.

Operational bottlenecks to check

Cut-outs vary on every drawing

One customer wants a round hole for a push button, another a rectangle for a meter. The punching programme and the drawing drift apart when a revision is not passed on.

Colour shades are remembered, not recorded

The buyer asks for the same grey as last year. The office searches emails. It looks for the shade card number and the coater’s batch.

Standard sizes and special units fight for the press

A stock cabinet run and a custom console both need the press brake on the same morning. Whoever shouts loudest goes first. That is no plan.

Accessories are packed from memory

Mounting plates, gland plates, keys, gaskets and earthing studs are fitted or bagged by hand. A missing item surfaces at the panel builder’s bench. Nobody is pleased.

Quotes miss the extras

Hinges, locks, windows and rain canopies are added late. The first quote carried none of them and the margin quietly disappears.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Catalogue or custom enquiry

    A buyer picks a catalogue size or sends a drawing with cut-outs. The enquiry records the outer dimensions, the DIN rail and mounting plate depth, the shade and the accessories asked for.

  2. 2. Quotation

    A stock size is priced from the catalogue. A custom unit is priced from developed sheet area, bend count, cut-outs, fittings and coating, using your own rates, and each revision is kept beside the last.

  3. 3. Order and nesting

    Acceptance of the quote turns it into an order. Sheet is issued against the nesting plan, and the punching or laser programme revision is noted so the operator loads the right file.

  4. 4. Fabrication

    Parts move through punching or laser cutting, press brake bending, welding or riveting, grinding and degreasing. Every stage records the machine and the operator who ran it.

  5. 5. Coating and assembly

    Units go through pretreatment to powder coating, with shade and batch noted. After cure, gaskets, locks, rails and gland plates are fitted from the accessory list printed with the unit.

  6. 6. Packing and billing

    Cartons are packed against the list and labelled. The carton list travels in the crate. Billing comes straight from the packed order, and the unpaid amount stays visible beside each panel builder.

Roles and responsibility boundaries.

For owners

See orders in the shop, stock sizes running low, the coating backlog and the balance owed by each panel builder. A morning glance replaces a round of phone calls.

For the estimating and design desk

Quote custom units, store revisions with their cut-outs and pull up the last order for the same drawing without digging through mail.

For press and welding supervisors

See the day’s units by machine, release nesting plans and mark stages finished. The brake queue is visible, so there is no shouting across the floor.

For the coating and assembly team

Open the shade and batch for each order, and pick gaskets, locks and rails from the list printed with the unit.

For stores and dispatch

Issue sheet and fittings, count packed cartons against the list and release the delivery note. A short crate is caught before the truck loads.

Reports your managers need.

  • Orders on each machine and stage, with the promised date
  • Stock sizes below reorder level
  • Sheet issued, scrap and offcuts returned by grade and thickness
  • Powder shades and batches used by customer
  • Accessory shortages found at the packing bench
  • Quoted against actual cost for custom units
  • Bills sent and amounts outstanding per panel builder

Connections to scope

  • Email
  • SMS
  • WhatsApp or other messaging
  • Accounting export
  • Barcode labels

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Catalogue and rates

Your stock sizes, sheet thicknesses, coating rates and accessory prices are loaded first, the way you quote them.

Stages and machines

Turret, fibre laser, press brake and welding stations are set up as the stages your shop really runs.

Shade cards and coaters

Shade names and the outside coaters you use are keyed in, so reordering a cabinet brings up the exact RAL finish.

Open orders migrated

Customer names, live orders and unpaid invoices are imported from the workbook your office keeps today.

Hosted by GullySystem

The system runs on our servers, and sales, the press shop and dispatch open the same unit record.

Limitations to settle before implementation

  • A job shop that only bends brackets and ducts for whoever calls will find Welding Shop Management Software nearer its work.
  • Makers of heavy machine frames and structures will find Structural Steel Fabricator Management Software closer.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Standard wall-mount and floor-standing enclosures
  • Custom enclosures to drawing
  • Outdoor and weatherproof cabinets
  • Stainless steel enclosures
  • Junction and terminal boxes
  • Mounting plates, gland plates and cutouts
  • Powder coating in standard shades
  • Battery and telecom cabinets
  • Repeat orders with stored drawings
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements