Skip to main content
GullySystem
Manufacturing

Business solutions for Plastic component manufacturers

Explore software for work such as “Approved vendor status with OEM purchase teams”. Review each business function below, including when it fits and what to check before implementation.

Plastic component manufacturers

How the business operates.

Industrial buyers do not order parts. They order part numbers at a stated drawing revision, released through call-off schedules that the buyer reissues, moving quantities, before the last pallet has cleared your dock. When revision C replaces revision B, the old stock in the racks becomes either a problem or a sale.

Part and revision register

Hold part numbers with drawing revision, resin grade, mould and packing specification, and block a superseded revision from release so the racks hold nothing unshippable.

Customer schedule intake

Load each weekly release and compare it with the previous one, so the planner sees every line that moved and nobody builds against a stale copy of the call-off.

First-article approval

Store measured sample results such as bore diameters, flatness and boss heights, with the customer’s approval date, against the part and revision it was signed for.

Assembly and rework cells

Record deflashing, gate trimming, ultrasonic welding, heat staking and insert fitting with the quantity passed through each cell, and note what went to scrap.

Kit packing and returnable trays

Build kits to the count. Fill trays and track the returnable trays and dunnage held at the customer’s site, so a missing stack of crates shows before the customer calls.

Rejection and corrective action log

Link each returned part to its press run, cavity and mould, record the cause and note the corrective action with an owner and date.

Mould cavity and shot history

Each mould’s cavities, shot count and last service date are logged against the part. The tool room sees when a mould is due for polish. No tool runs past its service limit.

Colour and masterbatch record

The resin grade, colour code and masterbatch ratio are recorded for each part and each customer approval. Operators mix from it at the machine. Colour complaints are checked against the batch used.

Customer tooling ownership list

Tools paid for by customers are listed with their owner, location and insured value. Account managers answer transfer requests from it. The record shows which customer tools sit idle.

Packing specification by part

Carton size, tray layout, labels and count per box are stored for each part number. Dispatch packs from the sheet. A customer’s new packing instruction replaces the older version after approval.

The records that hold the operation together.

  • Component quotations. Price a part from resin weight, cycle time, press tonnage, assembly steps and returnable packing, and keep each quote revision beside the drawing revision it priced. Old quotes stay readable.
  • Part and revision register. Hold each part number with drawing revision, resin grade, mould, packing specification and cut-in date, and count stock by revision rather than by part alone. A superseded revision cannot be released.
  • Customer schedule intake. Load each weekly release, compare it with the last, and show what moved in quantity and date for every part and customer before anyone touches the press schedule. The diff is the first screen.
  • Tooling ownership list. List each mould with its owner, rack, cavity count, shot count and last maintenance, so a customer’s tooling audit is answered from the list, not the racks. Audits stop being a walk.
  • First-article approvals. Store measured sample dimensions, the layout drawing and the customer’s approval date against each part and revision, then print an approval pack whenever a buyer requests a new revision. Proof is one click away.
  • Material lots. Record resin lot, regrind ratio, masterbatch and inserts per run, then link them to trays and loads sent out so a suspect lot is followed forward. Recall scope shrinks to a lot.
  • Assembly and rework cells. Log degating, trimming, ultrasonic welding, insert fitting and sub-assembly by cell, with passed and scrapped counts at every step that must reconcile with shots moulded. Gaps show up the same day.
  • Kit packing and trays. Fill trays to the customer’s count, print labels carrying part number and revision, and track the returnable trays, layer pads and dunnage still held at each customer plant. Missing trays get chased.

Operational bottlenecks to check

Revisions overlap in the racks

Revision B parts sit beside revision C parts on the same shelf, and the customer’s line stops when a pallet of the wrong one arrives at the receiving bay. Cartons carry no revision label.

Schedules change faster than plans

A weekly release replaces the last one, and planning against an old copy builds the wrong quantity of PA66 housings while leaving the right one unmade.

First-article records go missing

The measured sample that approved the part sits in a folder, and when a boss diameter or wall thickness is disputed the signed report is hard to produce.

Rejections are not tracked to a cause

A returned part is photographed and logged. It is not linked to the run, the cavity or the setter, so the same weld line or burn mark recurs.

Tool ownership is vague

Customer-owned tools sit among your own on the same racks. The mould’s owner, storage location, shot count and last polishing or service date sit in separate records.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Drawing and quotation

    The buyer’s drawing revision, tool ownership terms, resin grade and volume are recorded, and the quote prices moulding at cycle time before adding each assembly step and returnable packing. No price without a revision.

  2. 2. Tooling and first article

    The mould enters the register under its owner, with cavity count and shot counter, and measured samples with the customer’s approval are stored before volume release. Volume waits for sign-off.

  3. 3. Schedule intake

    Each weekly release is loaded and compared with the last, so the planner sees which quantities rose, fell or moved date for every part number. Changes are listed, not hunted for.

  4. 4. Moulding and cells

    Runs are planned against the schedule and the press that holds the mould, then parts move through degating, trimming and insert fitting with counts logged at each step. Every step reports a number.

  5. 5. Kitting and dispatch

    Parts are packed into trays to the customer’s count and labelled with part number and revision, and a delivery note travels with the load recording the tray count out. Trays are counted out.

  6. 6. Returns and corrective action

    A customer return is linked to its run, mould and cavity, the cause is written down, and the corrective action stays open until the customer confirms it. Closure needs the buyer’s reply.

Roles and responsibility boundaries.

For plant managers

Watch schedule changes, stock by revision, return rates by customer, open corrective actions and mould utilisation together on one screen, without asking four departments for a spreadsheet. Monday starts with facts.

For planners

Compare each weekly release with the last, rebuild the press plan around changed quantities, and group mould changes so set-up hours on the larger presses are not wasted. Fewer changeovers, steadier runs.

For cell supervisors

Log counts at each assembly step, pass or scrap parts against the routing, and raise insert shortages from the cell terminal before the line starves. The whiteboard can go.

For quality engineers

Keep first-article reports, take returns back to their run, mould and cavity, and close corrective actions with the customer’s written reply attached to the record. Evidence stays with the part.

For logistics staff

Pack trays to count, print labels with part number and revision, and chase the returnable trays and dunnage still sitting at customer plants. Balances show who holds what.

Reports your managers need.

  • Customer call-off changes by part number and week
  • Stock by part and drawing revision
  • Returns by customer, part, mould, cavity and cause
  • First-article approvals with sign-off dates
  • Cell throughput: passed, scrapped and reworked
  • Returnable trays and dunnage held per customer plant
  • Moulds by owner with shot counts and next maintenance

Connections to scope

  • Customer schedule files
  • Email
  • WhatsApp
  • Barcode label printer
  • Accounting export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Part and revision data

Part numbers, drawing revisions, mould records and packing rules are entered as each customer issues them, and cavity numbers are keyed from the mould plate. Nothing is inferred from memory.

Schedule formats

The layout of each customer’s release, whether a spreadsheet, a delimited text file or an email table, is mapped once, so loading it later is a single upload. Mapping happens before go-live.

Approval and check rules

First-article layouts and sample sizes are copied from each customer’s requirement and confirmed with your quality engineers before go-live, and control plan fields follow the same route. Your engineers sign off the forms.

Records brought across

Live schedules, the mould list with shot counts and tray balances are imported before the first release is run, and your team samples them against the shelf. Mismatches are fixed first.

Hosted by GullySystem

Planners, cell leads and the shipping desk read one part record on our servers, and any change to a part or packing record is a request to us. We make the edit.

Limitations to settle before implementation

  • A shop that sells catalogue items over the counter, with no drawings or schedules, can manage with a stock book.
  • Companies that are mainly bottle or pipe makers will find Blow Moulding Company Management Software or Plastic Extrusion Company Management Software closer.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Approved vendor status with OEM purchase teams
  • Spares supply to plant maintenance buyers
  • Replacement parts matched from worn samples
  • Machined parts from nylon, acetal and PTFE
  • Insulating and electrical components
  • Moulded parts with inserts or secondary work
  • Assembly supply to equipment makers
  • Export orders for small precise parts
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements