Skip to main content
GullySystem
← Back to the guide

Worksheet

Blow moulding reject checklist

A one page checklist for the machine. The top block holds date, machine, mould, cavity, resin lot and regrind share. The middle block lists twelve defect boxes with a tick and a count. The lower block holds parison programme points, die gap, melt temperature and an hourly weight row for each cavity.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Blow moulding rejects: wall thickness, weight and handle defects”, www.gullysystem.com/blog/blow-moulding-rejects-wall-thickness-weight-and-handle-defects