They connect through the site job. An approved quotation becomes a job, the store issues material to it, and measured work on the same job becomes a running bill. One record holds all three. Cost against billing is read, not rebuilt.
Why the three records drift apart
In an electrical firm the quotation sits in an Excel sheet, the store register is a ruled book, and the running bills are raised in accounts software. Each holds a third of the job. Nobody holds the whole picture. When the owner asks why a site used more conduit than quoted, someone must search the store book, the quotation file and the billing system separately.
The site may be spelled three ways across them, material issued is never tied to the quoted quantity, and bills are never tied to measured work. Site cost against billing then has to be rebuilt by hand, job by job, whenever the owner asks, and by then the answer is already stale.
What a quotation carries forward
A quotation built from your rate list holds quantities by point, item or area, and each revision is kept with the client’s approval. Approval turns it into a site job. Revisions keep their history. A single rate list means the same light point or power socket is priced the same way whether one estimator builds the quotation or another revises it later.
Those approved quantities are the base for everything after, because material is read against them and measured work is billed against them. Quote in the units you will issue and measure, such as metres of cable or numbers of points, or the comparison will not line up. Units are agreed up front.
- Approved quantities by area
- Rates used, from the rate list
- Revision history and client approval
- Floors and work stages of the job
Issue material against a named site
The site supervisor requests armoured cable, PVC conduit, MCBs, distribution boards or light fittings, and the store keeper writes an issue slip against that site with the quantity. Returns are booked back. Every issue is recorded. A site supervisor who needs another forty metres of cable on Thursday asks the store keeper, who records the quantity against that site before the drum leaves.
Because every issue slip names a site, the cable, conduit and switchgear cost of each job is visible, and store stock stays apart from stock at the site. Reorder levels flag low MCBs. The owner can see which sites drew the most cable, conduit and switchgear in a given month, and compare each against its quoted quantity. Month by month, the site-wise totals show whether a job is drawing material faster than its measured work is being billed, which is the warning the owner wants early.
From measurement to running bill
Supervisors enter measured work such as points wired and panels terminated, area by area, and the office reads it against the approved quantities before raising a running account bill. Advances, deductions and retention are carried on the client’s account, and the balance updates as each bill is approved, so the next bill starts from the correct balance. Retention stays on the account. A measurement entered on site on Friday evening is waiting in the office on Monday morning, so billing no longer depends on someone copying figures from a notebook.
Invoices cover wiring jobs, supply of material and service visits, with receipts and balances tracked for each client, and the ledger can go to your accountant as a file. Receipts post against bills.
Decisions to make before day one
Decide the rate list and the units first, then confirm the running bill formats your clients and builders accept before the first quotation is entered. Tax treatment is the accountant’s call. Then agree which role enters measurements and which role approves each bill, because the person who measures the work should not also approve the bill for it.
A contractor who works alone on small repairs can keep a notebook and a single invoice book, since there is no store and no second site to reconcile. The system pays off once several sites, a store and a billing office depend on the same quotation, issue slips and bills, so begin with one open site.
Put the advice to work.
Use a test copy or fictional example to turn the discussion into something your team can check.
What a quotation carries forward
Which assumptions stop being valid when the quotation changes?
For “What a quotation carries forward”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Site material issue register
Give every material issue a line of its own, with columns for date, site, item, unit, quantity issued, quantity returned and the supervisor who requested it. Add the quoted quantity beside each item for one site, then circle every line where issued material runs past what was approved.
Open a blank worksheet to printQuestions owners ask
Can material be tracked site by site?
Yes, cable, conduit, switchgear and fittings are issued against a named site and returns go back to the store, so material cost is visible for each job.
Does it handle running account bills?
Yes, measured work is entered by area and raised as a running bill, while the treatment of advances, deductions and retention is set with each client. Formats follow each builder’s requirements.
Where should a contractor start?
Start with one open site: its approved quotation, the cable and conduit already issued and the running bills already raised, so the first comparison uses real numbers.