Field Services · Electrical Contractor Management SoftwareSite jobs, quotations, material issue and running bills for electrical contractors.
Manage enquiries, site surveys, quotations and wiring jobs in one system. Cable, switchgear and fittings are issued against each site, and technician teams are assigned by job. Measured work becomes running account bills, the RA bills builder clients expect, with advances and retention carried on the account.
- Rate list, point rates and quotation formats entered as you price work today
- Open sites, clients and stock balances migrated
- Edits to rate lists and quotation formats carried out by us when you ask
Wiring contractors hold enquiries, tender notices and site surveys here, then carry each job through quotation, cable and fitting issue, daily attendance and measured running account bills. Supervisors, wiremen and office staff share one record. You choose which sites move onto it first.
What goes wrong before the software.
How the work flows through it, step by step.
- 1
Enquiry and survey
An enquiry arrives by phone, a reference, a builder’s call or a tender notice. A site survey is booked, and the connected load, point count, single-line diagram and drawings are noted against that enquiry before anyone prices it.
- 2
Quotation
A quotation is built from your rate list by item or by point, or against the client’s bill of quantities, and the client revises it more than once. Every version is kept, with its approval.
- 3
Site job
An accepted quotation becomes a site job. A technician team, a supervisor and a work plan by floor or area are attached from the first day. The plan shows conduit, wiring and fixtures as separate stages.
- 4
Material and labour
Cable, conduit, switchgear and fittings are issued to the site from the store. Technician attendance is booked to the same job, so labour and material cost sit side by side for every floor.
- 5
Measurement and billing
Measured work is entered by area as a measurement book record. It becomes a running account bill with tax added, and advances and retention are carried on the account until the builder finally releases them.
- 6
Handover and service
The job closes with its snag list, insulation and earthing test results and a handover record. A service contract or call-back schedule starts if the client takes one, with the first visit dated.
What is inside.
Every module can be switched on, left out or changed to match how your team already works.
Enquiries and site surveys
Record each enquiry, whether it comes from a builder, a reference or a tender notice. Keep the survey visit, connected load, point count, drawings received and the next follow-up date together, so that no tender lapses unanswered.
Learn moreQuotations and estimates
Build quotations from your own rate list of standard items, by point, item or area, and price a client’s bill of quantities (BOQ) line by line. Revisions and approvals are recorded for every version.
Learn moreSite jobs and work orders
Run each accepted quotation as a site job with floors, work stages, a team, a supervisor and a snag list. Each floor shows which DBs are wired, which are tested and what remains.
Learn moreMaterial issue and site stock
Issue cable, conduit, MCBs, MCCBs, panels and fittings against a named site, and return unused drums and boxes to the store, so every site carries its own material cost. Stock below reorder level is flagged for the purchase clerk.
Learn moreTechnician teams and attendance
Assign electricians, wiremen and helpers to sites, mark daily attendance, and see labour cost for each job. Overtime, advances and the helper’s half-days follow the same entries.
Learn moreMeasurements and running bills
Enter measured work by area as the measurement book (MB) record behind each bill. Raise running account bills (RA bills) with advances, deductions and retention, and keep the MB beside every bill it supports, ready for the builder’s engineer.
Learn moreTax billing and collections
Issue tax invoices for site jobs, supply-only material sales and service work. Track receipts and balances for each client, with the oldest invoice first, and see which builder is holding retention.
Learn moreService contracts and call-backs
Keep maintenance contracts, visit schedules and fault calls, with the technician and the work done recorded. A transformer, generator or panel inspection due next month appears on this month’s list, so the visit is booked before the client asks.
Learn moreSubcontractor and labour payments
Record work given to subcontractors and labour gangs, with measured work, advances and payments made. Each gang’s balance is read against what the measurement book shows, line by line.
Learn morePhone access for site teams
Let supervisors and technicians enter attendance, material use, measurements and photos from the site on a phone, so the office stops retyping pencil notes at day’s end.
Learn moreThe business modules it is built from.
Each one is also available on its own, or inside a system built for you.
- Estimate/Quotation Management
Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.
- Work Order Management
Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.
- Stock Tracking and Alerts
Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.
- Attendance & Time Tracking
Electricians, wiremen and helpers are assigned to sites with daily attendance marked, giving labour cost for each job.
- Invoice Management
Tax invoices cover site jobs, supply-only material sales and service work, with receipts and balances tracked for each client.
- AMC and Service Contracts
Maintenance contracts, visit schedules and fault calls are kept together, with the technician and work done recorded on each call-back.
- Lead Management
Each enquiry from a builder, reference or tender notice records the survey visit, connected load, point count, drawings received and next follow-up date.
How we would put it in.
Setup, data migration, integrations and anything built on top.
Explore moreBrowse business and AI solutions
Looking for another part of your workflow? Browse the modules by business function.
- Applicant Tracking (5)
- CRM (8)
- Finance & Accounting (10)
- Helpdesk (4)
- Human Resources (13)
- Inventory Management (5)
- Project Management (7)
- Manufacturing (6)
- Procurement (4)
- Sales and Distribution (6)
- Field Service (5)
- Statutory and Compliance (4)
- Retail and POS (4)
- Bookings and Appointments (3)
- Subscriptions (2)
- Assets and Fleet (4)
- Platform (6)
- Analytics (2)
- Documents (1)
- All business solutions
Topics beyond the modules.
Each page covers one part of how the system is used, connected or controlled.
Views for electrical contractor owners, supervisors and technicians
Each person in an electrical contracting firm sees the site, store and bill records that belong to their work.
Learn moreReports for electrical contractor owners and site managers
These reports are read from the quotations, material issues, attendance and bills that the team already enters.
Learn moreElectrical contractor software connections to WhatsApp, payments and accounting
It works alongside the messaging, payment and accounts tools an electrical contractor already uses.
Learn moreOne system, each person sees their part.
For owners
See quotations open, cost against billing for each site, client balances and payments due to subcontractors, without waiting for month end or phoning a single supervisor.
For electrical estimators and the office
Prepare quotations, follow enquiries and tenders, raise running bills and invoices, and keep client accounts in order from the measurement books that the site supervisors send in each week.
For site supervisors
See the work plan for the site. Request material, mark attendance and enter measurements before leaving the floor.
For store keepers
Receive cable, conduit and switchgear. Issue it to sites, take returns and see what is below reorder level.
For technicians
See the site assigned for the day, the work to be done and any call-back raised against you, with the address and the client’s contact on one screen.
The numbers the owner asks for.
- Quotations and tenders open, won and lost by client
- Site cost against billing for each job
- Cable, conduit and switchgear issued to each site, and stock below reorder
- Technician and wireman attendance and labour cost by site
- Running bills raised, approved and pending, with the MB behind each
- Client balances, mobilisation and other advances, and retention held
- Service contracts and inspection visits due
Who this is built for.
- Electrical contractors wiring homes, apartments and commercial buildings
- Firms that supply and fix panels, DBs, lighting and cabling for builders
- Contractors who work under a builder or main contractor on running bills
- Firms that take maintenance contracts for offices, factories and buildings
- Electrical contractors who run several sites with their own technician teams
When it is not the right choice.
- A single electrician who takes small repair calls and is paid in cash needs a notebook and a payment app.
- Firms that mainly build and manage whole buildings will find Construction Project Management Software closer to their work.
Adapted to your business before it goes live.
You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.
Works alongside
- SMS
- Bank transfer and payment gateway
- Accounting package export
- Biometric attendance
Checks to bring to your product demo.
Review these scenarios against the product configuration and record anything that still needs to be agreed.
Tax billing and collections
Can you explain the balance from its original documents?
Select a partly settled example in “Tax billing and collections”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.
Background reading: ERPNext: outstanding invoices
Quotations and estimates
Which assumptions stop being valid when the quotation changes?
For “Quotations and estimates”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Questions owners ask before a demo.
Can the builder’s engineer approve a measurement before it is billed?
No. No login is issued to the client. The measurement is entered on site and checked in the office, and whatever your builder’s engineer signs stays on paper, with the signed copy filed beside the bill.
Can quotations be built from our own point rates?
Yes. You enter your rate list once. Quotations are built by point, item or area from that list, and the formats your clients expect are confirmed during set-up, then reused for every enquiry that follows.
Can material be tracked site by site?
Yes. Cable, conduit, switchgear and fittings are issued against a named site, and returns go back to the store. The cost of each job is visible beside what was billed for it, floor by floor.
Does it handle RA bills against a BOQ?
Yes. Measured work is entered by area and raised as a running account bill. Part quantities against a BOQ line can be billed in stages, with advances and retention set with the client as the contract says.
Can supervisors use it from the site without signal?
Not live. The phone screens need a working connection, so an unconnected basement cannot be entered live. Supervisors enter attendance, material use, measurements and photos once signal returns, or the office enters them from their notes that evening.
Can job bills go into accounting software?
Not built in. Invoices, receipts and payments can be exported for your accountant. Pushing figures into your books is a quoted extra, priced after we see how your ledgers are laid out in the first workshop.
Can maintenance contracts be managed?
Yes. Contract terms, visit dates and fault calls are kept against each client. The technician and the work done are recorded on every visit.
Can open sites and stock be moved in?
Yes. Clients, open jobs, stock balances and unpaid bills are imported from your registers or sheets. Office staff check the imported records ahead of launch, so nothing starts with a wrong balance.
Who owns the data?
You do. The hand-back of your rate lists, site records and client accounts goes into the proposal in writing before work begins.
What does it cost?
Sites, users and the set-up work decide the cost. Biometric attendance, the payment gateway and the accounting export are separate parts. Your rate list, stock balances and unpaid bills to migrate add effort. No price is published. A demonstration comes first. The written quote follows, so share your requirements.
How soon can site supervisors begin logging material and attendance?
Enquiries, quotations on your point rates, site jobs and material issue would open the account. Attendance, measurements and running bills follow. Tax billing, service contracts, subcontractor payments and phone access for site teams come next. Dates for each stage come in the proposal. Bringing in the rate list sets the pace.
What registers and rate lists should the estimator pull out?
Pull out your rate list with point and labour rates, the material list of cable sizes, conduit and switchgear, open sites with stock balances, and unpaid bills. A measurement book page and a running bill show formats. Owners, the store keeper and a site supervisor each need a contact. Biometric device details help if attendance is connected.
Wondering what it would cost? Share your requirements and an engineer will come back with a scope.
Every part, on its own page.
Each page covers one part of the system: what it records, who uses it and what it hands on.
- Enquiry and Site Survey Records for Electrical Contractors
- Quotation and Estimate Builder for Electrical Contractors
- Material Issue and Site Stock for Electrical Contractors
- Site Jobs and Work Orders for Electrical Contractors
- Technician Teams and Attendance for Electrical Contractors
- GST Billing and Collections for Electrical Contractors
- Phone Access for Electrical Site Supervisors and Technicians
- Service Contracts and Call-backs for Electrical Contractors
- Subcontractor and Labour Payments for Electrical Contractors
- Measurements and Running Bills for Electrical Contractors
- Electrical Contractor Software Connections to WhatsApp, UPI and Tally
- Views for Electrical Contractor Owners, Supervisors and Technicians
- Reports for Electrical Contractor Owners and Site Managers
Written for this trade.
Practical notes on running the business, not product marketing.
How Do Electrical Quotations, Site Material Issue and Billing Connect?
See how an electrical contractor links an approved quotation to material issued at each site and to running bills, so job cost reads against billing.
Learn moreHow to Automate an Electrical Contracting Business
Learn what an electrical contractor sets up first: enquiries, quotations from your rate list, site material issue, attendance and running bills, in order.
Learn moreBuilt for.
The trades this product is set up for. Pick yours to see how the work runs there.
See Electrical Contractor Management Software set up around your records.
Tell us how you run things today. An engineer reads it and writes back with what fits as it is, what would need changing, and what we would start with.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements