Skip to main content
GullySystem

Notes for owners · Industry-Specific Software Guides

How to Automate an Electrical Contracting Business

Start with the quotation, because every later record hangs from it. Build quotations from your own rate list and run each accepted one as a site job. Issue material and book attendance against that site, then raise running bills from measured work. GullySystem’s Electrical Contractor Management Software holds these together.

Ganesh HS, Strategy and Technology, GullySystem · · 3 min read

Record enquiries and site surveys first

Every wiring job begins as an enquiry. It may arrive by phone, by reference or through a builder’s call. Record the source, the site and the date of the survey visit. Give each enquiry one record from the day it arrives.

At the survey, note the connected load, the point count and the drawings received. Set a date for the next follow-up. These details feed the quotation later, so they belong on the enquiry. Enquiries kept in several phones and notebooks cannot be followed up from one list.

  • Source of the enquiry and who took the call
  • Connected load and point count from the survey
  • Drawings received, with dates
  • Next follow-up date

Build quotations from your own rate list

Enter item rates, point rates and labour rates before anything else. Quotations are then built by point, item or area, the way your firm prices a floor or a flat. Rates typed afresh into each quotation drift apart over time. Keep the rate list in one place that the estimator and the owner both read.

Clients ask for revisions. Each version is kept, and the client’s approval is recorded against it. The owner can then read quotations open, won and lost by client. That report shows where enquiries are going. The estimator sees which quotations are waiting on a reply.

Run each accepted quotation as a site job

An approved quotation becomes a site job. The job carries floors or areas, work stages, a team, a supervisor and a snag list. Material and attendance are booked to this job and no other. One site, one record.

Set up the material master before the first site. Cable sizes, conduit, switchgear and fittings go in with the units you buy and issue in. The store keeper issues material against a named site and takes back what is unused.

Technician attendance is marked each day to the site where the person worked. Labour cost and material cost then sit on the same job.

Turn measured work into running bills

Supervisors enter measured work by area, from a phone if they are on site. The office reads it against the approved quantities. It becomes a running account bill, with GST, advances, deductions and retention carried on the account. Nothing is retyped.

Work given to subcontractors and labour gangs is recorded the same way, with measured quantity, advances and payments made. The owner can then read site cost against billing for each job, along with client balances and payments due to subcontractors. How advances and retention apply is set with each client.

When a notebook and UPI are enough

A single electrician who takes small repair calls and is paid in cash does not need this. A notebook and UPI will do. Firms that mainly build and manage whole buildings will find Construction Project Management Software closer to their work.

The system suits a contractor who quotes, runs several sites with its own technician teams and bills on measured work. Before buying, decide who enters what: the estimator, the store keeper or the supervisor. A technology audit at no charge is one way to settle that scope. Decide it early.

Enquiry to final bill checklist

A one-page checklist with a column for each stage: enquiry, survey, quotation, site job, material issued, attendance, measurement, running bill and handover. Fill it for one open site to see which stage has no record behind it today.

Open a blank worksheet to print

Questions owners ask

What should an electrical contractor set up first?

Set up the rate list and the material master first. Item rates, point rates, labour rates, cable sizes and fittings decide how quotations and store issues will look. Open sites, stock balances and unpaid bills can be imported from your registers after that.

Can site supervisors use it from the site?

Yes. Supervisors and technicians enter attendance, material use, measurements and photographs from a phone. The office sees these records as they are entered, so billing does not wait for a paper register to reach the desk.

Next step

Have a specific situation to work through?

This article covers the general case. Tell us what you’re actually dealing with and we’ll respond directly.

See the Electrical Contractor Management Software product