Skip to main content
GullySystem

Technician Teams and Attendance for Electrical Contractors

Electricians, wiremen and helpers are assigned to sites, and daily attendance is booked to the site where each worked. Labour cost for each electrical job can then be read from the same record.

Who is on the team list

Every worker is entered once, with the grade and the way they are paid, and the list covers both staff on salary and gangs on daily wages.

Grades and wages

Supervisor, electrician, wireman and helper each have a daily or monthly rate, and the overtime rules follow whatever the firm already pays on its sites.

Teams

A lead electrician with two helpers forms a team. Teams can be assigned to a site as a unit.

Skills and tools

Whether a technician can handle panel termination or testing is noted. Tools issued to a worker, such as a megger or a drill, can be listed against the name.

Attendance by site

A supervisor marks attendance at the start of the day, from the site, on a phone, and a biometric device can be connected where the firm already uses one.

Present, absent and half day

Status is marked for each worker. A half day at one site and a half day at another are recorded as two entries.

Overtime and night work

Extra hours are entered against the site that needed them. The pay follows the rule set for that grade.

Advances

Money given to a worker in advance is recorded and recovered from the next pay. The balance is visible to the office.

Labour cost for each job

Attendance days are priced at the worker’s rate and added to the site, so the owner reads labour cost beside material cost for the same job. A site with a long run of days and little measured work stands out.

What attendance does not do

The module records days and prices them. It does not decide wage rates, provident fund or insurance treatment. Those depend on how the firm employs its people and are settled by the proprietor together with the firm’s accountant.

Setting up attendance on electrical sites

Attendance sounds simple until three sites share one gang. These choices avoid arguments later.

One method per site

Phone marking by the supervisor, a biometric reader, or both with one deciding. Mixed methods create gaps.

Location as a check

Where used, a location stamp is recorded for audit and need not block the entry. Some crews move between buildings.

Cut-off for corrections

A missed day can be added by the supervisor until a cut-off set by the office. After that, the owner approves.

Questions for a workforce module

  • Can daily-wage and monthly staff sit in one list?
  • Does half-day split across two sites?
  • Are advances recovered automatically?
  • Can overtime rules differ by grade?
  • Is there a record of who edited an entry?

From attendance to wage sheet

The module prices days. A wage sheet then falls out of the same entries.

Days by site

Each worker’s days are shown by site for the period.

Rates and overtime

Grade rates and overtime rules apply as the firm already runs them.

Advances and recoveries

Advances paid are set against the amount payable.

A day of attendance across several sites

An electrical firm runs several sites at once, and people move between them. The supervisors, the coordinator and the accounts clerk each depend on the attendance record. This is how one working day is recorded, from the first muster to the evening review. Every move is noted.

Assigning people before the day starts

The coordinator allocates electricians and helpers to sites the evening before the work. Each supervisor sees their own list. Morning confusion at the gate shrinks because everyone has already been told where and when to report.

Marking who actually came

At the site, the supervisor marks attendance against the planned list. An absentee is noted. A replacement is called. The record shows who worked where, not who was meant to, which is what wages depend on.

Moving a technician mid-day

Both supervisors record the part day.

Attendance choices made before the first muster

Attendance records are easier to trust when the rules are fixed early. The owner, the coordinator and the accounts clerk agree how attendance is marked and who may correct it. Four decisions matter before anyone starts. Each prevents a quarrel over wages later.

Who marks and who corrects

Decide whether the supervisor alone marks attendance or helpers may mark their own. Corrections after the day need a named person. Wage sheets then rest on records that cannot be quietly changed by anybody in a hurry.

How part days are recorded

Agree how a half day or a move between sites is entered. One rule applies to every site. The labour cost for a job then adds up in the same way every month, and two supervisors do not disagree.

Which people are on the team list

Enter permanent staff, regular helpers and gang members separately in the team list. Each has a role. A person who leaves is made inactive, not deleted, so past attendance stays readable when an old wage question comes up.

How existing staff are brought in

Enter current staff with their role and daily rate before go-live. Past attendance stays in the old sheets. The first wage sheet from the system starts from a clean date that everybody in the office has agreed on.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Attendance by site

Can a correction be traced to the right date and session?

For “Attendance by site”, check a late correction against the original register. Agree who may amend it and which downstream total should change after the correction.

Background reading: Frappe HR: attendance records

Rates and overtime

Which rule wins when two rates or offers apply?

Use “Rates and overtime” to check an ordinary sale and one that meets two pricing conditions. Ask for the calculation behind each final amount, rather than only the total.

Background reading: ERPNext: pricing conditions

FAQ

Frequently asked questions

Can attendance be marked from the site?

Yes. The supervisor marks it on a phone, and the office sees it at once.

Does it work with a biometric machine?

Where the firm already has one, a connection can be scoped. Whether the device suits a changing site is confirmed first.

Can helpers on daily wages be handled?

Yes. They are entered with a daily rate, and their pay is the days marked present.

Does it produce payslips?

It produces a pay summary by worker for the period. Statutory deductions are handled according to the accountant’s advice.

How are workers who change sites during the day recorded?

As two entries. A half day at one site and a half day at another each count to their own job.

Can a supervisor mark attendance for a worker who forgot?

Yes, within the cut-off. The edit is logged with the supervisor’s name.

Does it hold safety training dates?

Skills and tools can be noted on the worker. The firm decides what else is recorded, such as certificates of competence.

What about contract labour from an agency?

They can be entered as a gang with a rate. The agency’s payment is handled through the labour payments module.

Where it fits

How this feature fits the system.

Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and estimates

Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.

Estimate/Quotation Management

Site jobs and work orders

Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.

Work Order Management

Material issue and site stock

Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements