Technician Teams and Attendance for Electrical Contractors
Electricians, wiremen and helpers are assigned to sites, and daily attendance is booked to the site where each worked. Labour cost for each electrical job can then be read from the same record.
Who is on the team list
Every worker is entered once, with the grade and the way they are paid, and the list covers both staff on salary and gangs on daily wages.
Attendance by site
A supervisor marks attendance at the start of the day, from the site, on a phone, and a biometric device can be connected where the firm already uses one.
Labour cost for each job
Attendance days are priced at the worker’s rate and added to the site, so the owner reads labour cost beside material cost for the same job. A site with a long run of days and little measured work stands out.
What attendance does not do
The module records days and prices them. It does not decide wage rates, provident fund or insurance treatment. Those depend on how the firm employs its people and are settled by the proprietor together with the firm’s accountant.
Setting up attendance on electrical sites
Attendance sounds simple until three sites share one gang. These choices avoid arguments later.
Questions for a workforce module
- Can daily-wage and monthly staff sit in one list?
- Does half-day split across two sites?
- Are advances recovered automatically?
- Can overtime rules differ by grade?
- Is there a record of who edited an entry?
From attendance to wage sheet
The module prices days. A wage sheet then falls out of the same entries.
A day of attendance across several sites
An electrical firm runs several sites at once, and people move between them. The supervisors, the coordinator and the accounts clerk each depend on the attendance record. This is how one working day is recorded, from the first muster to the evening review. Every move is noted.
Attendance choices made before the first muster
Attendance records are easier to trust when the rules are fixed early. The owner, the coordinator and the accounts clerk agree how attendance is marked and who may correct it. Four decisions matter before anyone starts. Each prevents a quarrel over wages later.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Attendance by site
Can a correction be traced to the right date and session?
For “Attendance by site”, check a late correction against the original register. Agree who may amend it and which downstream total should change after the correction.
Background reading: Frappe HR: attendance records
Rates and overtime
Which rule wins when two rates or offers apply?
Use “Rates and overtime” to check an ordinary sale and one that meets two pricing conditions. Ask for the calculation behind each final amount, rather than only the total.
Background reading: ERPNext: pricing conditions
Frequently asked questions
Can attendance be marked from the site?
Yes. The supervisor marks it on a phone, and the office sees it at once.
Does it work with a biometric machine?
Where the firm already has one, a connection can be scoped. Whether the device suits a changing site is confirmed first.
Can helpers on daily wages be handled?
Yes. They are entered with a daily rate, and their pay is the days marked present.
Does it produce payslips?
It produces a pay summary by worker for the period. Statutory deductions are handled according to the accountant’s advice.
How are workers who change sites during the day recorded?
As two entries. A half day at one site and a half day at another each count to their own job.
Can a supervisor mark attendance for a worker who forgot?
Yes, within the cut-off. The edit is logged with the supervisor’s name.
Does it hold safety training dates?
Skills and tools can be noted on the worker. The firm decides what else is recorded, such as certificates of competence.
What about contract labour from an agency?
They can be entered as a gang with a rate. The agency’s payment is handled through the labour payments module.
How this feature fits the system.
Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations and estimates
Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.
Estimate/Quotation ManagementSite jobs and work orders
Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.
Work Order ManagementMaterial issue and site stock
Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.
Stock Tracking and AlertsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements