Skip to main content
GullySystem

Enquiry and Site Survey Records for Electrical Contractors

Every wiring enquiry is recorded with its source, site and survey visit. The connected load, point count and drawings received stay on the enquiry, so the quotation starts from what was seen at the site.

What a site enquiry record holds

An electrical enquiry arrives by phone, from a builder, or through a reference from an earlier client. Each one gets a record the day it comes in.

Source and contact

The caller, the site address, the type of building and who referred the work are noted, so a builder’s enquiry and a homeowner’s can be read apart.

Scope as described

New wiring, a panel change, lighting for a showroom or an earthing fix is written in the client’s words. The survey later confirms or corrects it.

Follow-up date

A date is set for the next call. An enquiry that stays quiet for some days shows on the estimator’s list.

The site survey

A survey visit is booked against the enquiry with the estimator or supervisor who will go, and what was seen is entered once the visit is over.

Connected load and point count

Light points, fan points, sockets, AC points and heavy loads are counted by floor or room. The count feeds the quotation without being typed again.

Drawings and photographs

Architect drawings, electrical layouts and site photographs are attached to the enquiry. A revised drawing replaces the earlier copy while the old one stays on file.

Site conditions

Concealed or surface wiring, ceiling height, the supply point and any civil work still pending are recorded. These notes affect the price and the work plan.

Why a fixed survey checklist matters

Quoting guides agree that most estimating errors begin at the survey. A visit without a checklist forgets the meter room, the lift motor or the roof tank pump. Use the same sheet every time. Walk the premises in the same order. Photograph the distribution board before anyone touches it. Ask where fittings will come from, because a client who supplies their own chandeliers changes the price.

Loads and the supply point

A load form splits demand into lighting, motors, heating and air conditioning. The largest single motor matters on its own. Enter what the client plans to run, then note any expansion they mention. The supply authority, not the contractor, decides what connection a site gets. Record whether the existing service can carry the new load, and leave the final answer to the engineer.

From survey to quotation

Once the survey is entered, the estimator opens a quotation from the same record. Counts, drawings and notes carry across. The quotation should say what it excludes, how long it stays valid and what extra work costs per unit. A lost enquiry keeps its reason, which helps the owner see why work was not won.

Keeping enquiries from going cold

A builder who calls three firms buys from whoever answers well. Set the follow-up date at the time of the call, and put the estimator’s name on it. Record what the client said about timing and budget. A list sorted by date shows which enquiries need a call today. The ones that die do so quietly, so review the lost reasons monthly.

What this page does not do

The record does not price the work or visit the site. Load calculations and the design of a panel remain with the engineer or the contractor’s own estimator. What the supply authority needs for a new connection is confirmed with the client.

An enquiry handled from first call to survey notes

A wiring enquiry passes through three or four hands before a price is written. The coordinator, the site engineer and the estimator each add to the same record. Each step is short.

Logging the call at the office

The coordinator enters the caller’s name, the source of the lead and the site address. The enquiry gets a date. Nobody has to remember a phone call that came in while everyone was out on site.

Visiting the site with the survey sheet

The engineer walks the building and notes the connected load, the point count and the supply point. Photographs go onto the enquiry. These facts are written on the spot, not recalled in the van later.

Receiving the client’s drawings

The client sends a floor plan by message. The coordinator attaches it to the enquiry record at once. Across the week, the estimator then reads the drawing and the survey together, and notices any mismatch before pricing begins at all.

Passing the record to the estimator

The estimator opens the enquiry and finds everything gathered so far, including the survey notes. A reminder date is set. The quotation starts from what was seen at the site, so the price rests on facts.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

From survey to quotation

Which assumptions stop being valid when the quotation changes?

For “From survey to quotation”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Scope as described

Which observation would change the proposed scope?

For “Scope as described”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.

Background reading: GOV.UK: researching user needs

FAQ

Frequently asked questions

Can one enquiry cover several buildings?

Yes. A builder with three blocks can be entered as one enquiry with a survey for each block, and each block becomes its own quotation line later.

Who enters the survey details?

The estimator or the supervisor who visited, from the office or on a mobile while at the premises. The office sees the entry as it is made.

What happens when a client does not reply?

The enquiry stays open and shows on the follow-up list. It can be closed as lost, with a reason typed against it.

Is a drawing review part of this module?

No. Drawings are stored and attached, but checking them against the load is the engineer’s work.

What should an electrical site survey record?

Points by room, the supply point, wiring type, ceiling heights, access and pending civil work. Photographs of the main board and meter room finish the sheet.

Should the quotation state who supplies the fittings?

Yes. Say plainly whether lights, fans and switches are supplied and fixed, fixed only, or left out. A price dispute starts from that one line.

Can the survey be filled in on a phone?

Yes. The supervisor can enter points and notes while standing in each room, and the estimator reads them at the office.

Where it fits

How this feature fits the system.

Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and estimates

Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.

Estimate/Quotation Management

Site jobs and work orders

Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.

Work Order Management

Material issue and site stock

Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements