Skip to main content
GullySystem

Quotation and Estimate Builder for Electrical Contractors

Quotations are built from the contractor’s own rate list, by point, item or area. Each revision is kept, and the client’s approval is recorded before the quotation becomes a site job.

Pricing the way you price today

An electrical quotation can be priced per point, per square foot, by item list or as a lump sum for a panel. The rate list holds all of these.

Point-based quotations

A light point and a fan point each carry a rate that includes wire, conduit and labour as you define it, and the survey count fills the quantities.

Item-wise quotations

Cable by size, MCBs, DBs, switches and fittings are listed with quantity, make and rate. Supply-only and supply-and-fix lines can sit in the same quotation.

Labour lines

Fixing, testing and commissioning are priced as their own lines. The owner can see how much of a quotation is material and how much is labour.

Revisions and approval

A builder asks for a lower price or a changed scope, so the estimator opens a new version, and the earlier one is kept alongside it for reference.

Version history

Each version shows what changed, who changed it and when it went to the client, so nobody has to hunt for the quotation that was actually sent.

Client approval

The approved version is marked, with the approver’s name and the day of approval. That version is the one the site job uses.

Terms and exclusions

Payment terms, validity, items left to the client and civil work excluded are written into the quotation. The wording follows your own format.

From quotation to site job

An approved quotation opens a site job with its quantities already set as the planned scope. Later bills and material use are read against those quantities. A variation approved on site is added as a new line rather than changing the original.

What the client decides

The builder does not set your rates, and the software does not suggest them. Which items are supply-only, how GST is shown and what retention is held are matters between you, the client and your accountant.

Where an electrical estimate goes wrong

Most losses start before the first wire is pulled. A missed riser, a forgotten DB or an old cable rate is enough.

Counts taken from drawings

Estimators count points, panels and cable runs from the drawing or the survey. Two people counting the same floor can disagree. Keeping the count on the quotation lets a second person check it.

Stale material rates

Copper and cable prices move. A rate list with a date on each line shows which prices are old before a quotation leaves the office.

Scope that was never written down

Chasing, core cutting, painting after wiring and permits are typical disputes. A named exclusions list stops the argument later.

Questions for an electrical estimating tool

Buyers compare tools on a few practical points. These are the ones that matter for a contracting firm.

  • Can the rate list hold point rates, item rates and labour rates side by side?
  • Are old versions kept, with the sent date?
  • Can a lost quotation carry a reason?
  • Does the approved quantity carry into the site job?
  • Who can change a rate, and is that logged?

How a quotation moves through the office

The path is short, but each step has an owner.

Enquiry and survey

Client and building go on the enquiry record at the start. The estimator visits, counts and notes the site conditions.

Draft and internal check

A draft is built from the rate list. The owner or a senior estimator checks margin before it is sent.

Follow-up

Each sent quotation has a follow-up date. Quotations that went quiet appear on the estimator’s list.

Pricing a wiring job from call to approval

A quotation is not written in one sitting. The estimator, the owner and the client each shape it, and the record keeps every version. This is how one wiring job is priced and approved, step by step, from the survey notes to the signed go-ahead.

Starting from the survey notes

Here, the estimator opens the enquiry and reads the point count and the connected load. The contractor’s rate list is on hand. A first draft is built by point, item or area, with each line named plainly.

Pricing with the rate list

Each line takes its rate from the list. Material, labour and margin are visible to the owner. A mistyped rate is corrected in the list once, not hunted down and fixed in every quotation separately.

Revising after the client’s comments

The client asks for fewer points and a different panel. The estimator makes a revised version. The earlier one stays on record, so nobody argues later about what was offered first or at what price.

Recording approval and starting the job

The client approves a version and the owner marks it accepted. The quotation becomes a site job. The approved scope and price travel with it into the work, and the site team reads the same figures.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Quotation and Estimate Builder for Electrical Contractors

Which assumptions stop being valid when the quotation changes?

For “Quotation and Estimate Builder for Electrical Contractors”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Pricing the way you price today

Which rule wins when two rates or offers apply?

Use “Pricing the way you price today” to check an ordinary sale and one that meets two pricing conditions. Ask for the calculation behind each final amount, rather than only the total.

Background reading: ERPNext: pricing conditions

FAQ

Frequently asked questions

Can the rate list be changed for one client?

Yes. A client can have its own rates, so a regular builder’s point rate need not match a homeowner’s.

Does it remember which quotations were lost?

Yes. A quotation closed as lost keeps its reason, and the win and loss list is available to the owner.

How does the quotation reach the client?

It is printed or sent as a PDF by email or WhatsApp, in the format set up for your firm.

Will it check my cable sizing?

No. The sizing and design are the engineer’s decision. The quotation holds the items and rates you choose.

What goes into a quotation besides material and labour?

Most firms add testing, commissioning, transport, a contingency and any supervision cost. Each can be its own line so the client sees what is covered. The rate list holds them like any other item.

Can I quote supply-only for one part and supply-and-fix for another?

Yes. Each line carries its own type, so one quotation can mix both. The totals show them separately.

How long should a quotation stay valid?

That is your call. Firms set a validity of a few weeks because cable and switchgear prices move. The validity date prints on the quotation and a reminder shows before it ends.

Can I copy an old quotation for a similar building?

Yes. Copy it, change the quantities and the rates that moved, and the new one starts as a fresh version. The old one stays untouched.

Where it fits

How this feature fits the system.

Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and estimates

Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.

Estimate/Quotation Management

Site jobs and work orders

Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.

Work Order Management

Material issue and site stock

Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements