Site Jobs and Work Orders for Electrical Contractors
An approved quotation becomes a site job with floors, stages, a team and a supervisor. Progress, snags and handover are kept on the job, so the office and the site read the same record.
Setting up a site job
The job opens with the planned scope from the approved quotation, and the office then divides it into the parts of the building the site will actually work in.
Tracking progress on site
The supervisor marks each area against its stage. Work done is read against the plan.
Snags and handover
When a floor is complete, the client or consultant walks it and points out faults. Each one goes on the snag list with the technician responsible and the date it was cleared. The handover record closes the job and starts any service contract.
What the job record leaves out
It does not draw the layout or schedule other trades. The plumber and the carpenter work to their own plans. Testing and inspection steps the site must follow are decided with the client and the consultant.
Where site jobs slip
Site work slips in small ways. Most of them can be seen early if the job record is kept daily.
Testing and handover on an electrical job
Before a floor is handed over, the installation is tested. Standards for low-voltage installations, such as IEC 60364-6, describe initial verification, which includes inspection and tests like continuity of protective conductors and insulation resistance.
- The engineer’s readings are attached to the area they belong to
- Test results are not judged by the system; your engineer applies the standard that governs the job
- Handover papers, drawings and warranty dates are stored on the job
- Open snags must be closed or accepted before the stage is marked done
Questions for a site job tool
- Can scope be split by floor and by stage?
- Do variations feed the next running bill?
- Can a work order link to measurement and payment?
- Can two supervisors cover one site?
Following one site job from kick-off to handover
A site job runs for a long stretch and passes through several roles. The supervisor, the technicians and the office each use the same record. This is how one job moves from its first day on site to the final key handover. The facts stay in one place.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Work orders to teams
Is the plan based on demand that is still open?
Review “Work orders to teams” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Setting up a site job
Which assumptions stop being valid when the quotation changes?
For “Setting up a site job”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Frequently asked questions
Can one firm run more than one site at the same time?
Yes. Each site is its own job with its own team, material and bills. The owner’s view lists every site with its stage.
Can a technician work on two sites in a day?
Yes. Attendance can be split across sites, and labour cost follows the split.
Are photographs stored with the job?
Yes. Photographs taken from the phone are attached to the area and date they were taken.
Does it handle other trades on the same site?
No. It covers the electrical work only. Other trades keep their own plans.
How are variations priced?
You price them the way you do today, from the rate list or by agreement. The variation is entered on the job with the client’s approval, then picked up by the next bill.
Can I see which floors are behind?
Yes. Each area shows its stage and its planned points against points done. Slow floors are listed first.
What happens to a job after handover?
The job closes and its records stay. If a service contract follows, the building moves to the maintenance list.
Can a supervisor close a snag without the client?
That depends on the rule you set. A supervisor marks it fixed, and it stays open until the client accepts.
How this feature fits the system.
Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations and estimates
Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.
Estimate/Quotation ManagementSite jobs and work orders
Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.
Work Order ManagementMaterial issue and site stock
Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.
Stock Tracking and AlertsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements