Site Jobs and Work Orders for Electrical Contractors

An approved quotation becomes a site job with floors, stages, a team and a supervisor. Progress, snags and handover are kept on the job, so the office and the site read the same record.

Setting up a site job

The job opens with the planned scope from the approved quotation, and the office then divides it into the parts of the building the site will actually work in.

Floors, blocks and areas

A job is split into floors, blocks or flats, and each area carries its own planned points, panels and cable runs from the quotation.

Work stages

Conduit laying, wire pulling, switch and fitting fixing, panel termination, testing and handover are typical stages, and your own stage names can replace them.

Team and supervisor

A supervisor and a group of electricians, wiremen and helpers are assigned. A technician can move between sites, and the record shows which.

Tracking progress on site

The supervisor marks each area against its stage. Work done is read against the plan.

Daily work notes

A short note and photographs record what was done and what stopped the work, so a civil delay or a missing drawing is written down that day.

Work orders to teams

A work order gives a team or gang a defined piece of work, such as wiring a floor. It later links to the measurement and the payment.

Variations

Extra points or a changed layout asked for on site are entered as a variation against the job. They feed the next running bill.

Snags and handover

When a floor is complete, the client or consultant walks it and points out faults. Each one goes on the snag list with the technician responsible and the date it was cleared. The handover record closes the job and starts any service contract.

What the job record leaves out

It does not draw the layout or schedule other trades. The plumber and the carpenter work to their own plans. Testing and inspection steps the site must follow are decided with the client and the consultant.

Where site jobs slip

Site work slips in small ways. Most of them can be seen early if the job record is kept daily.

Waiting on others

Civil work not finished, a slab not cured or a drawing not approved. The daily note names the cause, so the delay is on record.

Material not at site

A floor stops because conduit ran out. The supervisor’s request and the store’s reply are both timed.

Concealed work

Conduit and earthing laid in slabs cannot be checked later. Photographs taken before cover-up are the proof.

Testing and handover on an electrical job

Before a floor is handed over, the installation is tested. Standards for low-voltage installations, such as IEC 60364-6, describe initial verification, which includes inspection and tests like continuity of protective conductors and insulation resistance.

  • The engineer’s readings are attached to the area they belong to
  • Test results are not judged by the system; your engineer applies the standard that governs the job
  • Handover papers, drawings and warranty dates are stored on the job
  • Open snags must be closed or accepted before the stage is marked done

Questions for a site job tool

  • Can scope be split by floor and by stage?
  • Do variations feed the next running bill?
  • Can a work order link to measurement and payment?
  • Can two supervisors cover one site?

Following one site job from kick-off to handover

A site job runs for a long stretch and passes through several roles. The supervisor, the technicians and the office each use the same record. This is how one job moves from its first day on site to the final key handover. The facts stay in one place.

Opening the job at kick-off

The office converts the approved quotation into a site job and sets the floors, the stages and the team. On the floor, a supervisor is named. Everyone starts from the same scope and the same plan, which cuts early confusion.

Updating progress at day’s end

The supervisor marks which stages moved on each floor of the building that day. Notes record blockers, such as a missing chase. The office reads the record, so nobody telephones the site to ask how the work is going.

Logging snags during testing

While testing circuits, a technician notes defects against the floor and the room. Each snag has an owner. The list shrinks as items are closed, and what remains is clear to everyone who reads it.

Handing over to the client

Once snags are closed, the supervisor marks the handover. The record holds what was done and when. A later complaint can be answered from it with dates, instead of with a vague recollection of events.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Work orders to teams

Is the plan based on demand that is still open?

Review “Work orders to teams” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Setting up a site job

Which assumptions stop being valid when the quotation changes?

For “Setting up a site job”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

FAQ

Frequently asked questions

Can one firm run more than one site at the same time?

Yes. Each site is its own job with its own team, material and bills. The owner’s view lists every site with its stage.

Can a technician work on two sites in a day?

Yes. Attendance can be split across sites, and labour cost follows the split.

Are photographs stored with the job?

Yes. Photographs taken from the phone are attached to the area and date they were taken.

Does it handle other trades on the same site?

No. It covers the electrical work only. Other trades keep their own plans.

How are variations priced?

You price them the way you do today, from the rate list or by agreement. The variation is entered on the job with the client’s approval, then picked up by the next bill.

Can I see which floors are behind?

Yes. Each area shows its stage and its planned points against points done. Slow floors are listed first.

What happens to a job after handover?

The job closes and its records stay. If a service contract follows, the building moves to the maintenance list.

Can a supervisor close a snag without the client?

That depends on the rule you set. A supervisor marks it fixed, and it stays open until the client accepts.

Where it fits

How this feature fits the system.

Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and estimates

Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.

Estimate/Quotation Management

Site jobs and work orders

Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.

Work Order Management

Material issue and site stock

Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements