Skip to main content
GullySystem

Service Contracts and Call-backs for Electrical Contractors

Maintenance contracts and fault calls are kept against each client and building. Visit dates, the technician sent and the work done are recorded, so the next visit is never held in memory alone.

Maintenance contracts

Electrical firms that look after the buildings they wired use a contract record to keep the terms, the equipment and the visits in one place.

Contract terms

The client, the building, the equipment covered, the start and end dates and the visits promised are entered once. Renewal dates appear before they fall due.

Scheduled visits

Quarterly or monthly checks of DBs, earthing and lighting are listed for each contract. A missed visit appears on the owner’s list.

Equipment list

Panels, UPS units, changeover switches and generators covered by the contract are listed with their location. The report from each visit refers back to them.

Fault calls and call-backs

A client phones with a tripping MCB or a dead circuit, and the call is logged with the building, the fault as described and the time it came in.

Assigning a technician

The office assigns a technician and the call appears on that person’s phone. Calls from contract clients are marked, so they are attended first if the owner chooses.

Work done and parts used

On site, the technician records what was found, what was repaired and which parts were fitted. Parts come off the store balance.

Repeat faults

A circuit that fails twice in a month shows up when the fault history of the building is opened. The owner can then ask for a proper check.

From visit to invoice

Contract visits are not billed again. A chargeable call-back produces its service bill from the visit itself. Parts and labour appear on separate lines for the client. Free repairs inside a warranty period are tagged, so the cost is still known.

What the contract record leaves to you

Response times promised to the client and warranty terms are set by the firm in its own contracts. The system records them and shows what is due. It does not decide whether a fault is covered.

Planning a maintenance visit

Every visit has a purpose. Before leaving the office, each technician needs the equipment list, the last findings and the tools.

Checklist for the visit

DB tightness, earthing continuity, lighting levels and UPS or generator checks can be listed per contract. The technician ticks each and adds remarks.

Findings that need a quote

A worn changeover switch or an overloaded circuit becomes a follow-up item. The office turns it into a quotation instead of leaving it in a note.

Sign-off by the client

The client’s representative signs on the phone. The report is filed against the contract.

Questions for a maintenance contract tool

  • Are missed visits visible without anyone searching?
  • Can one fault be linked to the contract it falls under?
  • Is the parts cost on a call-back charged or absorbed, and who decides?
  • Does warranty end date show for each installation?
  • Can the client’s history be opened on the phone during a call?

Why repeat faults matter

A circuit that trips every few weeks is rarely bad luck. It points to overload, a loose joint or a failing device.

Spotting the pattern

Fault history sits against the building and the circuit. Three calls on one floor in a month stand out.

Deciding what to do

The owner can send a senior electrician for a proper check. Test readings from that visit are attached to the record.

Contracts and fault calls through a working day

Maintenance work arrives as a planned visit or as an urgent fault call. The coordinator, the technician and the accounts clerk each handle a part. Here is how one day passes, from the morning’s list to the invoice that follows. Both kinds of work share one record.

Reading the day’s visit list

The coordinator opens the contracts due for a visit and the fault calls logged overnight by the office. Each shows the client, the building and the last work done there. The technician leaves with a plan.

Attending a fault call

A technician reaches a building. Its circuit keeps tripping. The visit is recorded with the fault found and the fix made. A repeat call for the same building is visible the next time it rings.

Completing a scheduled visit

On a maintenance visit the technician notes what was checked and what was replaced. The next visit date is set before leaving. Nobody relies on memory to keep a contract alive from one season to the next.

Billing from the visit record

The accounts clerk reads the visits done that week against each contract. Chargeable work becomes an invoice line. The client sees what was done and why it costs what it does, with the dates beside it.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Questions for a maintenance contract tool

What proves that a planned task was actually completed?

Select an overdue entry in “Questions for a maintenance contract tool”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

From visit to invoice

Can you explain the balance from its original documents?

Select a partly settled example in “From visit to invoice”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

FAQ

Frequently asked questions

Can a client call be raised from the phone?

Yes. Staff in the office or a supervisor can log a call on a phone, and it reaches the assigned technician.

Are reminders sent to the client before a visit?

Yes, where messaging is set up. A message by WhatsApp or SMS can be sent before the visit date.

Can a warranty period be tracked?

Yes. The end date of the warranty is kept on the job, and calls inside it are marked as free.

Is a service contract required to use this?

No. Firms that only do new installation can leave the module unused.

How do I know a contract visit was actually done?

Each contract visit carries a technician, a date and a checklist. Photographs or the client’s signature can be added. Without these, the visit stays open.

Can I set different visit frequencies for different equipment?

Yes. A panel can be visited quarterly and a generator monthly under the same contract. Each schedule runs on its own.

What if a client calls outside the contract hours?

The call is logged with the time it arrived. Your own terms decide whether it is chargeable. The record shows which terms applied.

Can I bill an annual contract in instalments?

Yes. The instalment plan is entered on the contract and each due date appears for the accounts desk.

Where it fits

How this feature fits the system.

Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and estimates

Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.

Estimate/Quotation Management

Site jobs and work orders

Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.

Work Order Management

Material issue and site stock

Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements